Laserfiche WebLink
I <br />! <br /> <br />Street Construction <br /> <br />Item <br /> <br />Grading <br />Class 5 Base Course <br />Bituminous paving <br />Turf Restoration <br />Drive Restorations <br /> <br />Subtotal Street Construction <br /> <br /> Table 1 <br />Estimated Project Costs <br /> <br />Qty. Unit Price Extension <br /> <br />Lump Sum 4,000 4,000 <br />1,600/ton 6.50/ton 10,400 <br />910 ton 26/ton 23,660 <br />2.1 acres 1,000/acre 2,100 <br />4 each 500/each 2,000 <br /> <br />$42,160 <br /> <br />Storm Sewer Construction <br /> <br /> Item <br /> <br /> 15" Storm Sewer <br /> 12" Storm Sewer <br /> Storm catchbasin <br /> Storm manholes <br /> Sedimentation pond & outfall <br /> <br /> Subtotal Storm Sewer Construction <br /> Total Construction Cost <br /> <br /> Overhead ~ 33% Construction Cost <br /> Total Project Cost <br /> <br />Qty. Unit Price Extension <br /> <br />700 feet 20/foot 14,000 <br />50 feet 15/foot 750 <br />2 each 800/each 1,600 <br />3 each 1,200/each 3,600 <br />Lump Sum 3,500 3.500 <br /> 23,450 <br /> <br />65,610 <br />21,651 <br /> <br />87,261 <br /> <br />PROJECT FINANCING <br /> <br />Exhibit A identifies 22 parcels which all have access frontage from the streets proposed for <br />paving. Eighteen of these properties have residences, and the four remaining parcels are eligible <br />for a building permit. It is proposed that all 22 lots be equally assessed regardless of individual <br />front footage or value of improvements on individual lots, as this has been past City policy on <br />previous paving projects. <br /> <br /> <br />