Laserfiche WebLink
Steve Jankowski <br />Page 2 <br />February 20, 1996 <br /> <br />Review shop drawings and change orders, <br />payment requests. <br /> <br />Estimated "not-to-exceed" cost for basic services: <br /> <br />prepare and certify <br /> <br />$1,490.00 <br /> <br />Our estimated cost of technical service for the project are as follows: <br /> <br />Technical Services <br /> <br />Provide construction staking and inspection. <br /> <br />$3,000.00 <br /> <br />Preparation of as-built plans. <br /> <br />300,O0 <br /> <br />Estimated cost of technical services provided by <br />Hakanson Anderson Associates, Inc. <br /> <br />$3,300.00 <br /> <br />All of the above costs are based on our current hourly rates and the estimated cost of <br />the basic engineering services is a not-to-exceed cost. The cost of the technical <br />services is an estimated cost and will depend on the contractor and the weather <br />conditions during construction. The above costs did not include permit fees, testing <br />services or miscellaneous expenses. Testing services are proposed to be billed on a <br />cost plus ten percent (10%) overhead cost. <br /> <br />Based on the size of the project, there is a possibility that the project could be added <br />to the 1995 Business Park 95 Addition Project being constructed by W. B. Miller. This <br />would eliminate the need for bidding and provide for early construction this spring. <br /> <br />We again wish to express our appreciation to you for this opportunity to offer our <br />services to the City of Ramsey, and look forward to working with you on this project. <br /> <br />Sincerely, <br />HAKANSON ANDERSON ASSOCIATES, INC. <br /> <br />Peter R. Raatikka, PE <br /> <br />jig <br /> <br />mckinley <br /> <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br />! <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />