My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 03/12/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:28:28 PM
Creation date
9/23/2003 1:38:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> <br />1~153 NOWTHEN BOULEVARD N.W., RAMSEY, MINNESOTA 55303 <br /> <br />PHONE (612) 427-1410 FAX (612) 427-5543 <br /> TDD (612) 427-8591 <br /> <br />March 12, 1996 <br /> <br />Mr. Jon Olson <br />Anoka CountylEngineer <br />Anoka County!Highway Department <br />1440 Bunker Lake Boulevard <br />Andover, MN 55304 <br /> <br />Dear Mr. Olson: ( <br /> <br />The purpose of this letter is to relate the City of Ramsey's desires with regard to improvement <br />projects listed in the Anoka County Five Year Highway Improvement Plan. Please consider these <br />comments as you and the County Public Works Committee update this Five Year Plan. <br /> <br />The City desires the project involving the reconstruction of C.S.A.H. #5 at T.H. #47 be <br />accelerated in the scheduling process. Two reasons for this project acceleration include the fact that <br />the City will shortly complete a corridor study along T.H. g47. This corridor study defines more <br />clearly the extent of the project than in the past. I feel that the proposed scope of the project <br />represents a reduction over that which may have been anticipated in the past. It would also be <br />desirable to sohedule this project for FY 1999 when MnlX)T is proposing to do several <br />consmaction projects along T.H. g47, which will likely involve a detour of the highway. <br /> <br />Second, the City remains highly supportive of the extension of C.R. #116 between C.R. #56 and <br />C.R. #83, which is currently scheduled for 1998. Because C.R. #116 represents a critical <br />infrastructure element in the rapidly developing Ramsey/Anoka industrial area, the City encourages <br />the consideration of the further expansion of C.R. #116 from C.R. #83 to T.H. #10. <br /> <br />Third, the City requests the consideration of expanding C.R. #116 between C.R. #57 and T.H. <br />#47, and C.R. #57 between C.R. #116 and T.H. #10 from two to four lanes. The purpose of <br />both these requests stem from the City's anticipation of heavy traffic generation from the <br />developing commercial/industrial area adjacent to these routes. <br /> <br />Finally, the CitY requests the consideration of the improvement of C.R. #63 between C.R. #83 and <br />C.S.A.H. #5. ~lthough this roadway is not in a rapidly developing portion of the City, the City <br />feels its current condition is sufficiently poor to warrant improvement. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.