Laserfiche WebLink
Page Ko. 6 <br />03/07/95 <br /> <br />ANOKA COUNTY HIGHWAY DEPARTMENT <br /> FIVE YEAR PLAN - LISTING <br /> <br />PROJECT <br />NUMBER <br /> <br /> YEAR SCHEDULED: 2000 <br />C,W. 0 00-02-00 <br /> <br />C.W. 0 00-03-00 <br /> <br />C.W. 0 <br /> <br />CSAH <br /> <br /> Subto%al <br /> <br />DESCRIPTION YEAR <br /> <br />2000 CRACK PILLING 2000 <br />2000 BRIDGE MAINTENANCE 2000 <br />2000 OVERLAYS 20OO <br />2000 SIGNALS UNASSIGNED (4) 2000 <br />HANSON INTERCHANGE WITH TH 10 2000 <br /> <br /> ENGINEERS CIP <br />* ESTIMATE STATUS <br /> <br /> 75000 <br /> 4~OO0 <br /> 75OOOG <br /> <br />200000 <br />1780000 Y <br /> <br />2840000 <br /> <br />CONTRol <br />'NUHB <br /> <br />* <br /> <br />P=PRESERVATION <br />M=MANAGE~{ENT <br />E=EXPANSION <br /> <br />m <br /> <br /> <br />