Laserfiche WebLink
Page No. 5 <br />O4/17/96 <br /> <br />ANOKA COUNTY HIGHWAY DEPARTMENT <br /> FIVE YEAR PLAN LISTING <br /> <br />PROJECT <br />NUHBER DESCRIPTION <br /> <br /> ENGINEERS CIP <br />YEAR * ESTIMATE STATUS <br /> <br />YEAR SCHEDULED: 2000 <br /> <br />C.W. <br />C.W. <br />C. W. <br />CSAH <br />CSAH <br />CSAH <br />CSAH <br />CSAH <br /> <br />O 00-02-00 <br />O 00-03-00 <br />O OO-O1-OO <br />O <br />11 <br />14 <br />35 95-42-35 <br />78 <br />78 <br /> <br /> 2000 CRACK FILLING 2000 <br /> <br /> 2000 BRIDGE HAINTENANCE 2000 <br /> 2000 OVERLAYS 2000 <br /> 2000 SIGNALS UNASSIGNED (4) 2000 <br /> <br /> HANSON INTERCHANGE WITH TH 10 2000 <br /> DE/RW <br /> INTERCHANGE AT 1-35W 2000 <br /> <br /> 8Ist AVE TO TH 10 FT RD $4OOK 2000 <br /> FED <br />02-678-11 CSAH 11 (SOUTH LEG) TO CSAH1 2000 <br /> <br /> RAIL GRADE SEPERATION 2000 <br /> <br />Subtotal <br /> <br />* P = Preservation H = Hanagement <br /> E = Expansion <br /> <br />Annual Shortfall <br /> <br />Accumulative Shortfall <br /> <br /> 70000 <br /> 40000 <br /> <br />1560000 Y <br />3575000 Y <br />100000 S <br />· 540000 F <br />695000 Y <br /> <br />3,030~815 <br />4,824,812 <br /> <br />() <br /> <br />() <br /> <br />Additional State & Federal <br />Funds Needed <br /> <br />16- <br /> <br />CONTROL <br />NUMB <br /> <br /> O <br /> <br /> O <br /> <br /> O <br /> <br /> O <br /> <br /> 0 <br /> <br />89 <br /> <br /> 0 <br /> <br /> I <br /> I <br /> I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br /> <br />