My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 07/23/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:34:29 PM
Creation date
9/24/2003 9:27:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />July 19, 1996 <br />Mr. Steven J. Jankowski, P.E. <br /> <br /> · Confer with City representatives prior to finalizing plans. <br /> <br /> · Provide project observation by a registered professional engineer. <br /> <br /> · Review shop drawings, prepare change orders, if necessary, and prepare and certify <br /> payment requests. <br /> <br />We propose to ~rovide these "Basic Engineering Services" on an hourly basis with a not to <br />exceed amount of $7,350. <br /> <br />We also propose to provide the following "Technical Engineering Services" for the budgeted <br /> <br />costs shown: <br /> Technical Service <br /> <br /> · Provide right-of-way plat <br /> <br /> · Provide construction staking <br /> <br /> · Project construction inspection <br /> · Preparation of as-built plans <br /> <br /> · Obtain the necessary soil borings. <br /> <br />We understand that borings were <br /> <br />Budgeted Cost <br /> <br /> $ 1,000.00 <br /> 3,000.00 <br /> 6,500.00 <br /> <br /> 500.00 <br /> <br /> N/C <br /> <br />completed for the previous utility project and are available for <br />reference from the City <br /> <br />Provide material sampling and testing, quality control testing and <br />density testing on materials. (Not requested in RFP but we propose <br />to use STS) <br /> <br />2,000.00 <br /> <br />$13,000.00 <br /> <br />The "Technical Engineering Services" are proposed to be provided on an hourly basis. We <br />anticipate using STS for the material testing and compaction tests and they will bill the City <br />directly. The budgeted fee for construction staking assumes each necessary item in the project <br />will be staked for construction only one time. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.