Laserfiche WebLink
Page 2 <br />July 19, 1996 <br />Mr. Steven J. Jankowski, P.E. <br /> <br /> · Confer with City representatives prior to finalizing plans. <br /> <br /> · Provide project observation by a registered professional engineer. <br /> <br /> · Review shop drawings, prepare change orders, if necessary, and prepare and certify <br /> payment requests. <br /> <br />We propose to ~rovide these "Basic Engineering Services" on an hourly basis with a not to <br />exceed amount of $7,350. <br /> <br />We also propose to provide the following "Technical Engineering Services" for the budgeted <br /> <br />costs shown: <br /> Technical Service <br /> <br /> · Provide right-of-way plat <br /> <br /> · Provide construction staking <br /> <br /> · Project construction inspection <br /> · Preparation of as-built plans <br /> <br /> · Obtain the necessary soil borings. <br /> <br />We understand that borings were <br /> <br />Budgeted Cost <br /> <br /> $ 1,000.00 <br /> 3,000.00 <br /> 6,500.00 <br /> <br /> 500.00 <br /> <br /> N/C <br /> <br />completed for the previous utility project and are available for <br />reference from the City <br /> <br />Provide material sampling and testing, quality control testing and <br />density testing on materials. (Not requested in RFP but we propose <br />to use STS) <br /> <br />2,000.00 <br /> <br />$13,000.00 <br /> <br />The "Technical Engineering Services" are proposed to be provided on an hourly basis. We <br />anticipate using STS for the material testing and compaction tests and they will bill the City <br />directly. The budgeted fee for construction staking assumes each necessary item in the project <br />will be staked for construction only one time. <br /> <br /> <br />