Laserfiche WebLink
Planning Proposal for: <br />Mississippi West Regional Park <br /> <br />Anoka County Department of Parks and Recreation <br /> <br />4. DEVELOPMENT CONCEPT <br /> <br /> The map and discussion of the Mississippi West Regional Park are on pages 10-11. <br /> <br /> Listed below is !the schedule and cost estimate for each portion of the master plan. Please note the <br />schedule of development is affect by the tWo residents living within the park (see page 16). <br /> <br /> SCHEDULE COST / UNIT TOTAL COST <br /> <br />First Ph .ase ' <br />Frontage Road ~ 2000 1.f. two lane w / no parking <br />Boundary Controls ~ fen. cing/ signage 8000 l.f. plus signage <br />Entry Road r 300 I.f.. four lane divided <br />Park Road (first phase on concept plan) 4800 1.f. two lane <br />Visitor Contact Station $50,0.00.00. <br />Trail Head <br />Shelter Building.w r~strooms - water $60,000.00 $60,000.00 <br />Orientation / Infb.rmstion Kiosk $5,000.00 $5,0.00.00 <br /> Bike Lockers ' 6 units ~ $1000.00 / unit plus base $7000.00 <br /> Parking Lot ~. 30 car capacity $700 per car $21,000.00 <br />Major Park Trail - 10' vd'de 10,000 1.fi ~ $12.00 per 1.fi $120,000.00 <br />Small Boat Access 20 parking spaces and ramp. $40,000.00 <br />Oak - Savanna Restoration preparation - planting - maintenance $50,000.00. <br />Extension of Public Utilities <br />Water ? <br />Sanitary Sewer ? <br />Electrical ? <br />Storm Water Pond size not established $20,000.00 <br />Assessment of Significant Trees $3,000.00 <br />Total <br /> <br />Second Phase <br /> <br />Group picnic ' <br />Shelter B.uildings (1) w / restroom (3) ~ $20,000. (1) ~ $60,000 i$i'20,000.00 <br />Park Road 300 1.f. two lane <br />Parking Lot .. 100 car capacity ~ $700. per car $70,000.00 <br />Park Trails 5000 1.f. ~ $8.00 per 1. f. $40,000.00 <br />Fishir~. g Access (1) pier $15,000. oo <br />Oak - Savanna Restoration preparati_o.n - planting - maintenance $50,000.00 <br />Total <br /> <br />27 <br /> <br /> <br />