My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/13/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 08/13/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:34:43 PM
Creation date
9/24/2003 9:41:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/13/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSIDER CHANGE ORDER TO <br />$.R. WEIDEMA FOR STORM SEWER MODIFICATION <br />TO IMPROVEMENT PROJECT 896-21 <br /> By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />A site plan for the :construction of an office and manufacturing facility for Vision Ease, Inc. <br />appears on tonight's agenda. The drainage plan proposes a direct discharge from the site's parking <br />lot into the storm sewer to be constructed in Sunwood Drive. Plans for this storm sewer anticipate <br />drainage from the road plus some additional discharge from the adjacent development; however, <br />larger size storm sewer pipes will be required to handle the runoff without on-site ponding on the <br />Vision Ease site. Tt'iis portion of the project has not been completed and the pipe sizing can easily <br />be changed. <br /> <br />The cost of up-sizing this storm pipe is $2,383.70. In addition, the contractor has requested an <br />additional $1,242 to connect to an existing manhole. The contract anticipated this manhole would <br />be placed by another contractor, but that contractor's scheduling caused placement of the manhole <br />first. Finally, Publi¢ Works has requested a hydrant be placed near the City shop yard to facilitate <br />a convenient location to fill the street sweeper and water truck at a cost of $2,000. <br /> <br />Recommendation: <br /> <br />Staff recommends approval of C.O. #1 to Irnprovement Project <br /> <br />Committee Action: <br /> <br />Motion to recommend City Council approval of Change Order #1 to Improvement Project 8'95-21 <br />in the amount of $51'625.70. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Finance Officer <br /> <br />RB: 08/13/96 <br /> <br />/jmt <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.