Laserfiche WebLink
The County shall request authorization from the Metropolitan Council to <br />commence development of the Project with future eligibility as a grant reimbursement project. <br />The County shall apply and manage the grant process through the Metropolitan <br />Council CIP funding request including, grant administration and project documentation for the <br />purpose of seeking funds to reimburse the City. <br />B. Design <br />Upon Metropolitan Council's approval of the revised Master Plan for Mississippi <br />West Regional Park and authorization to commence development of the Project with future <br />eligibility as a grant reimbursement project, the County shall undertake the design process. The <br />County shall provide all engineering services to prepare the plans and specifications for the <br />construction of the Project. The County shall not go out for bids until such time as the City has <br />approved, in writing the plans and specifications for the Project. <br />C. Bidding/Construction <br />The County shall do the calling for all bids and the acceptance of all bid <br />proposals and shall cause the construction of the Project in conformance with the plans and <br />specifications. After receipt of all necessary governmental approvals, the County shall cause <br />the construction of the Project during 2011. <br />111. COSTS <br />A. Within 30 days after the Metropolitan Council approves the Project as eligible for <br />future grant reimbursement, the City shall pay to the County the sum of $20,000.00 ( "City's <br />Share "). <br />B. The contract costs of the work, or if the work is not contracted, the cost of all <br />labor, materials, normal engineering costs and equipment rental required to complete the work, <br />shall constitute the "Actual Construction Costs" and shall be so referred to herein. "Estimated <br />Costs" are good faith projections of the costs, which will be incurred for this Project. Actual <br />costs may vary and those will be the costs for which the relevant parties will be responsible. <br />C. The Estimated Costs of construction of the Project is $390,000.00. <br />D. The City shall pay for the Actual Construction Costs of the Project. Upon award <br />of the contract to construct the Project, the City shall pay to the County the Estimated Costs less <br />the City's Share ( "Deposited Amount"). If the Actual Construction Costs of the Project exceed <br />the Deposited Amount, the City shall pay the County the difference within 30 days of the County <br />providing documentation of said amount to the City. If the Actual Construction Costs is Tess <br />than the Deposited Amount, the County shall at the time of the completion of the Project pay the <br />difference to the City. <br />1V. TERM <br />This Agreement shall continue until such time as the County has connected the access <br />road to other internal park roads to be constructed in the future and the City's obligation to <br />maintain the access road has terminated as provided hereinafter. <br />