Laserfiche WebLink
CC Regular Session <br />Meeting Date: 07/12/2011 <br />By: Tim Himmer, Engineering/Public <br />Works <br />7. 1. <br />Title: <br />Consider Award of Contract for City Improvement Project 10 -25; the Bituminous Paving of Chameleon Street <br />Background: <br />A petition was received from 12 of the 20 property owners having frontage on Chameleon Street on February 2, <br />2010 for the bituminous paving of Chameleon Street, between 173rd Ave and 176th Lane, in the Shawn Acres <br />subdivision. This petition was received by the Council on February 23, 2010, and a feasibility study was ordered. <br />The feasibility study was completed and discussed by the Public Works Committee on June 15, 2010. The public <br />hearing for the project was held by the City Council on August 24, 2010, and the project ordered on October 26, <br />2010. At the time the project was ordered one change was made to the feasibility study, which was to apply a <br />single assessment share to the property at 17310 Chameleon Street due to the combination of two separate parcels <br />into one (the Council agreed to cover the single share that was eliminated from the assessment roll). Council <br />authorized the solicitation of bids on June 14, 2011, and they are scheduled to be opened on July 8, 2011. <br />Observations: <br />The project is proposed to grade and pave a 28 foot wide road centered within the existing 66 foot right of way. <br />The pavement section will consist of six inches of class 5 granular base, two inches of bituminous base course, and <br />1.5 inches of bituminous wear course. This project will also include the grading of ditches alongside the roadway <br />and new culverts will be placed beneath each driveway. Storm water improvements will direct drainage to <br />discharge into utility easements dedicated on the plat or as acquired. <br />Recommendation: <br />Bids are scheduled to be opened on Friday July 8th, and will be forwarded to the Council under separate cover. <br />Staff will review the bids and make a formal recommendation at the July 12, 2011 meeting. <br />Funding Source: <br />The total cost of the project is estimated to be $336,000, and is anticipated to be financed as follows: <br />• $149,000 City General Fund (includes asmt. for Shawn Acres Park, and additional share for lot combination) <br />• $51,000 Storm Water Utility <br />• $136,000 Property Assessments <br />Council Action: <br />Motion to award a contract for City Improvements Project # 10 -25; the Bituminous Paving of Chameleon Street, to <br />XXX in the amount of $XXX. <br />Location Map <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 07/07/2011 11:08 AM <br />Kurt Ulrich Kurt Ulrich 07/07/2011 01:20 PM <br />Form Started By: Tim Himmer Started On: 07/07/2011 09:20 AM <br />Final Approval Date: 07/07/2011 <br />