Laserfiche WebLink
I <br />I <br /> <br />BID TABULATION <br /> <br /> Owner; City of Ramsay <br /> City: Ramsay, Minnesota <br /> Project: MCKINLEY STREET NW & AZUI~ITE STREET NW <br /> <br />John Oliver & Associates, Inc. <br /> <br />Project No.: I.P. 96-23 <br /> File No.: 7356.18-~3 <br /> Date: September6, 1996 <br /> <br />I <br />I <br />i <br /> <br />NO. <br /> <br />BID SCHEDULE A - Sanitary Sewer <br /> <br />Connect to E%~st~ng Manhole & Riser <br />8" PVC, SDR 35, 8' to 10' Depth <br />8" PVC, SDR 35, 10' to 12' Depth <br />Standard Manhole, 48" Dia., 0' to 10' <br />Extra Depth 48" Dia. Manhole <br />8" x 6' VVye <br />B" PVC, SDR 35 Service Pipe <br />8" Plug <br />Cn~shed Rock Pipe Beddin9 <br /> <br />TOTAL BID SCHEDULE A - Sanl~ry Sewer <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br /> <br />11 <br />12 <br />13 <br />14 <br />15 <br /> <br />BID SCHEDULE B - Watermath <br /> <br />Cut Into Existing 8" Watermain W/Tee & Sleeve <br />6" Wel Tap On Existing 8" Watermeln <br />B" DJ.P, Class 52 <br />6" DJ.P, Class 52 <br />8" Valve <br />6" Valve <br />Hydrant <br />8" xS" Tee <br />8"x6"Tee <br />8' - 11 1/4 Degree Bend <br />8" Plug <br />6" Plug <br />6" Bends <br />3" Insulation <br />Relocate Hydrant W/Valve <br /> <br />TOTAL BID SCHEDULE B - Water,lain <br /> <br />LS <br />LF <br />LF <br />EA <br />LF <br />EA <br />LF <br />EA <br />TN <br /> <br /> W.B. Miller, Inc. Bonine Excavating Kober Excavating, Inc. <br /> LOW RID <br />~4UN T::~ :~:~::~;::i~::~y:!~t~i:~:~iuNlT~!:~i:~I:~:~:~:~:~:~::::i!~ ~:~::uNm!!~i~f:~::::: ::' <br /> <br /> I <br /> I <br /> I <br /> ! <br />i <br /> I <br />I' <br /> <br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 6 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br /> <br />BID SCHEDULE C-Storm Sewer <br /> <br />12" RCP, Class 5 <br />36" RCP, Class 3 <br />36" RC Apron W/Trashguard <br />Calchbasin, (24" x 36"} <br />Manhole 60" Diameter (Depth Vades <br />Manhole 72" Diameter (Depth Vadm <br />Grouted Rip Rap Class 2 <br /> <br />TOTAL BID SCHEDULE C - Storm Sewer <br /> <br />BID SCHEDULE D - Streets <br /> <br />Clearing & Grubbing <br />Common ExcavalJon (P) <br />Topsoil Borrow (CV) <br />Aggregale Base Placed, Class 8 <br />Bituminous Wear Course (2331 Type 41 B) <br />Bituminous Base Course (2331 Type ~.16) <br />Conc~ele Cum &Gutler (6618) <br />Traffic Control <br />Seeding W/Mulch, Disc .Anchoring & Fer~lizer <br />Pen'nanent Ba~cades Type 111 <br />Adjusl Existing Cas§ng (A) <br />Adjust E. xist~ng Casting (B) <br />Adjust Existing Casting (C) <br />Adjust Existing Casting (D) <br /> <br />TOTAL BID SCHEDULE D - Streets <br /> <br />EA <br />LS <br />LF <br />LF <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br /> <br />SF <br />EA <br /> <br />LF <br />LF <br /> <br />LS <br />C'~ <br /> <br />FOI <br /> <br />FOI <br />LF <br />LS <br />AC <br />EA <br />LS <br />LS <br />LS <br />LS <br /> <br />o'.DO 1,500.00 <br />29.00 13.00 <br />378,OO 13.00 <br /> 4.00 J 1,600.00 <br /> 2.46I 85.00 <br /> 1.00 50.00 <br /> 32.00 12.00 <br /> 3.00 25.00 <br /> 20.00 10.00 <br /> <br />1,200.00 <br />1,200.00 <br />18.25 <br />15.50 <br />600.00 <br />400.00 <br />1.300.00 <br />150.00 <br />150.00 <br />110.00 <br />40.00 <br />30,00 <br />1 00,00 <br />2.00 <br />1,050.00 <br /> <br />3,000.O0 <br />377,00 <br />4,914.00 <br />6,400.00 <br />209.10 <br />50.00 <br />384.00 <br />75.00 <br />200.00 <br /> <br />15,609.10 <br /> <br />1,200.00 <br />1,200.00 <br />3,558.75 <br />1,209.00 <br />1,200.00 <br />800.00 <br />1,300.00 <br />150,00 <br />150.00 <br />110.00 <br />40.00 <br />30.00 <br />600,00 <br />768.00 <br />2,100.00 <br /> <br /> 1.O0 <br /> 1.00 <br />195.O0 <br /> 78.00 <br /> 2.O0 <br /> 2.00 <br /> 1,00 <br /> 1.O0 <br /> 1.00 <br /> 1.00 <br /> 1.O0 <br /> 1.00 <br /> 6,00 <br />384.00 <br /> 2.00 <br /> <br />J 14~415,75 <br />lOl.OO I 18.00 J 1,818.00 <br />1 ,o22.oo j 50.00 J 51,100.oo <br /> 1.oo I 1,6oo.001 1,6oo.oo <br /> 2.001 800.09 1 1,800.00 <br /> 4.00 J 2,500.00 j 10,000.00 <br /> 2.00 1 2,800.00 1 5,200.00 <br /> 30.00 j 30.001 9o0.00 <br /> <br />72,218.00 <br /> <br />100.00 <br />9,450.00 <br />400.00 <br />15,300.00 <br />12,985.00 <br />25,300.00 <br />18,620.00 <br />300.00 <br />1,200.00 <br />600.00 <br />450.00 <br />450.00 <br />450.00 <br />450.00 <br /> <br />86t055.00 <br /> <br />3,152.00 <br />14.75 <br />16.75 <br />1,200,00 <br />55.O0 <br />23.00 <br />8.80 <br />10.O0 <br />O.O1 <br /> <br />2,567.00 <br />3,280.00 <br />16.85 <br />14.05 <br />462.00 <br />329.00 <br />1,422.00 <br />112.00 <br />103.00 <br />75.00 <br />25.00 <br />26.00 <br />50.00 <br />2.30 <br />743.00 <br /> <br />18.30 <br />47.52 <br />1,211.00 <br />707.00 <br />1.600.00 <br />2.060.00 <br />25.00 <br /> <br />500.0C <br /> 1.4C <br /> 8.4C <br /> 7.05 <br /> 25.23 <br /> 25,24 <br /> 6.89 <br />100,0~ <br />994.08 <br />250.00 <br />250.00 <br />410.00 <br />250.00 <br />250.00 <br /> <br />6,304.00 <br />427.75 <br />6,331.50 <br />4,800.00 <br />135.30 <br />23.00 <br />281.60 <br />39.00 <br />0.20 <br /> <br />18~333.35 <br /> <br />2,567.00 <br />3,280.00 <br />3.285.75 <br />1,095.90 <br />924.00 <br />658.00 <br />1,422.00 <br />112.00 <br />103.00 <br />75.oo <br />25.00 <br />25.00 <br />300.00 <br />883.20 <br />1,486.00 <br /> <br />16~241.S5 <br /> <br />1,848.30 <br />46,565.44 <br />1,211.00 <br />1,414.00 <br />6,400.00 <br />4,120.00 <br />750.00 <br /> <br />64,308.74 <br /> <br />500.00 <br />4,900.00 <br />6,720.00 <br />15,862.50 <br />13,371.90 <br />27,764.00 <br />18,327.40 <br />100.00 <br />2,991.12 <br />500.00 <br />250.00 <br />410.00 <br />250.00 <br />250.00 <br /> <br />92,196.92 <br /> <br />1.00 100.00 <br />3,500.00 2.70 <br />800.00 0.50 <br />2,250.00 6.80 <br />530.00 24.50 <br />1,100.00 23.00 <br />2,669.00 7,00 <br />1.00 300.00 <br />1.50 800.00 <br />2.00 300.00 <br />1.00 450.00 <br />1.00 450.00 <br />1.00 450.00 <br />1.00 450,00 <br /> <br /> 710.00 <br /> 11.00 <br /> 12.00 <br /> 1,300.00 <br /> 76.00 <br /> 53 O0 <br /> 11.00 <br /> 19.00 <br /> 14.00 <br /> <br />1,200.00 <br />1 .B0O.00 <br />16.00 <br />14.00 <br />550.00 <br />420.00 <br />1,400.00 <br />160.00 <br />150.00 <br />101.00 <br />33.00 <br />34.00 <br />72.00 <br />2.93 <br />930.00 <br /> <br />21 O0 <br />51.00 <br />1,800.00 <br />910.00 <br />1,800.00 <br />2.300.00 <br /> <br />3,000.00 <br /> 2.50 <br /> 6.72 <br /> 7.12 l <br /> 26.00 <br /> 24.00 I <br /> 697 ~ <br /> 260 00 I <br />2 000.00 I <br /> 400.00 <br /> 320 00 <br /> 320.00 ! <br /> 320.00 r <br /> 320.00 I <br /> <br />,420.00 <br />319.00 <br />4,536.00 <br />5,200.00 <br />186.98 <br />53.O0 <br />352.00 <br />57.00 <br />260.00 <br /> <br />12,403.96 <br /> <br /> 1,200.00 <br /> 1,800.00 <br /> 3,120.00 <br /> 1,092.00 <br /> 1,100.00 <br /> 840.00 <br /> 1,400.00 <br /> 160.00 <br /> 150.00 <br /> 101.00 <br /> 33.00 <br /> 34.00 <br /> 432.00 <br /> 1,125.12 <br /> 1,860.00 <br /> <br />14,447.12 <br /> <br />2,121.00 <br />52,122.00 <br />1.800.0D <br />1.820,00 <br />7,200.00 <br />4,600.00 <br />1,800.00 <br /> <br />71,463.00 <br /> <br />3,000.00 <br />8,750.00 <br />5,376.00 <br />16,020.00 <br />13,780.00 <br />26,400.00 <br />I8,540.20 <br />260.00 <br />3,000.00 <br />800.00 <br />320.00 <br />320.00 <br />320.00 <br />320.00 <br /> <br />97,206.20 ~, <br /> <br />SUMMARY <br /> <br />I': <br /> <br />TOTAL BID SCHEDULE A - Sanltary~Sewer <br />TOTAL BID SCHEDULE B - Waterm~ln <br />TOTAL BID SCHEDULE C - Storm S~jwer <br />TOTAL BID SCHEDULE D - Streets <br /> <br />TOTAL <br /> <br /> 18,609.10 <br /> 14,415.75 <br /> 72,216.00 <br /> 86~055.00 <br /> <br />$188,297.85 <br /> <br /> 18,333.35 <br /> 16,241.85 <br /> 64,30S,74 <br /> 92,196.92 <br /> <br />$191,080.86 <br /> <br /> 12,403.99 <br /> 14,447.12 <br /> 71 463.09 <br /> 97,206.20 <br /> <br />$195,520.28 <br /> <br />Page I of 2 <br /> <br /> <br />