Laserfiche WebLink
SCHEDULE A - Detail of Watermain Lateral Benefit Costs From IP 5~95-13 <br /> <br /> 1,190 Ft 8" Watermain @ 18~t $21,420 <br /> 2 Ea Std. Hydrants @ 1,600/Ea 3,200 <br /> 2 Ea 6" Gate Valves @ 325/Ea 750 <br /> Total $25,370 <br /> <br /> SCHI~DULE B - Summary of Overhead Costs <br /> <br /> Fiscal and Legal 3% $ 3,894 <br /> Administrative 5% 6,490 <br /> <br /> Engineering - actual (14.7%) 19,032 <br /> (Schedule C) <br /> <br /> Miscellaneous (Schedule D) 46 <br /> $29,462 <br /> <br /> ~C_HEDIJLE (~ . Engineering Costs <br /> John Oliver & Associates $18,552.75 <br /> Braun Engineering 479. t 3 <br /> $19,031.88 <br /> <br /> SCHEDULE D - Miscellaneous Costs <br /> Postage $ 1.92 <br /> Publication 44.06 <br /> $ 46.08 <br /> <br />/30 <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br /> <br />