Laserfiche WebLink
! <br /> I <br />I <br />I <br />I <br />I <br />I <br />! <br />I <br /> <br />sEnt~.neering 10% <br /> ng and Inspection 7% <br />Fiscal and Legal 3% <br />Adininistration 5% <br />Contingencies 5% <br /> <br />Since the City entged into an agreement to relocate the roadway, it is proposed that the City would <br />finance this cost. i Thus, the assessable project cost would be reduced by $5,840 from the total <br />project cost. <br /> <br />TABLE 1 <br /> <br />ESTIMATED PROJECT COSTS <br /> <br />Bituminous Paving <br />Class V Base Cora'se <br />Regrade Roadway* <br />Fine Grade/Test Rbll <br />Culvert <br />Turf Restoration <br />Estimated Construction <br /> <br />Cost <br /> <br />450 tons @ $26/ton <br />1000 tons @ $6/ton <br />Lump Sum <br />Lump Sum <br />3 ea @ $400/ea <br />2.5 acres @ $1,000/acre <br /> <br />Overhead Costs @ 30% Construction Cost <br />Total Project Cost <br /> <br />Project Assessable Cost <br /> <br />*City Cost for 'Relocating the Roadway <br /> <br />$11,700 <br /> 6,000 <br /> 4,500 <br /> 1,500 <br /> 1,200 <br /> 2.500 <br /> $27,400 <br /> <br />8.220 <br /> <br />$35,620 <br /> <br />$29,770 <br /> <br />$ 5,850 <br /> <br />PROJECT FINgANCING <br /> <br />It is proposed that the project assessable costs be divided equally among the six benefitted <br />properties. Thus, ~each parcel identified in Exhibit A would be responsible for $4,962. The City <br />had agreed to accept an amount of $9,430 from the developer of Dellwood Hills as full payment <br />for the paving of l~ison Street for the benefit to parcels two and three. It is therefore proposed that <br />the City would coritribute the difference of $494 between the amount escrowed and the amount due <br />for these two parcels. <br /> <br />If the project should proceed to the stage where the City Council authorizes plans to be prepared <br />and bids to be solicited as required by law, the City Council may award the construction to the <br />lowest responsibl~ bidder, providing that bid does not exceed 110% of the construction cost <br />estimates containad herein. After the project has been completed and final costs are known, the <br />public hearing wtll be held which will identify the actual costs to be recovered by special <br />assessment. Eachiproperty may, at any time prior to certification of the assessment to the County <br />Auditor, pay the Whole of the assessment on such property, with interest, except tth~at no interest <br />shall be charged if the entire assessment is paid within thirty (30) days from the adoption of the <br />resolution. Special assessments reported to Anoka County shall be payable over a ten-year period <br />with interest at a {~te of 2% above prime rate at the time of the special assessment hearing. This <br />rate is estimated t0 be 11%. The costs presented in this report are estimates. Table 2 presents a <br />project financing summary as it would affect individual properties. <br /> <br /> <br />