My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/08/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 10/08/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:36:35 PM
Creation date
9/24/2003 2:31:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/08/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Conformance With Plan, The Plat shall be developed pursuant to the final plat <br /> consisting of one (1) sheet prepared by Caine & Associates Land Surveyors, Inc., entitled <br /> "Alpaca Estates 4th Addition". <br /> <br />3. Incorporation ot' All City Code RequlremenIs, That the recitals above and the <br /> provisions of the City Charter, Subdivision Code, Zoning Code and Public Improvement <br /> Code of the CITY, as amended to date hereof, are incorporated herein by reference. <br /> <br />Stage I lm. pr0yements Required. The DEVELOPER agrees to construct the <br />required Stage .I Improvements according to the terms and conditions of this contract and in <br />accordance with the DEVELOPER'S plans submitted to the CITY. Said plans shalI be <br />in general conformance with the Preliminary Plat for the Plat prepared by Caine & <br />Associates and dated August 22, 1996. The final construction plans for streets shall be <br />submitted to the City Engineer for review and approval prior to construction. The <br />DEVELOPER shall also be responsible, at its expense, for installation of gas, telephone, <br />and electric utility improvements. Street lights are the responsibility of the <br />DEVELOPER, however, the CITY will arrange for their installation as a Stage II <br />Improvement. The DEVELOPER shall be responsible for completing the rough grading <br />and providing lot comer stakes prior to the installation of underground utilities. <br /> <br />The Stage I Improvements to be constructed are as follows: the westerly extension of <br />Riverdale Drive N.W. from its current terminus in Alpaca Estates to Llama Street N.W. <br />and Llama Street N.W. from Riverdale Drive N.W. north to T.H. gl0. <br /> <br />Boulevard and Area Restoration. The DEVELOPER shall beresponsibleforthe <br />cost of establishing seed or sod in ali boulevards within thirty (30) days of the completion <br />of the street improvements, and restoring all other areas disturbed by the development <br />grading operation. <br /> <br />Requirements After Street Surfacing. The DEVELOPER shall clear any soil, <br />earth or debris from streets and from the lots within the Plat resulting from any construction <br />on the Subject Property by the DEVELOPER or their successors and assigns. <br /> <br />Developer's Financial Guarantee. "The DEVELOPER agrees and understands that <br />the CITY has the fight, privilege and authority pursuant to Minnesota Statutes Chapter <br />462.358 and as amended as a condition precedent to the approval of the plans and <br />specifications and approval of a final plat, to prescribe requirements and the extent to <br />which, and the manner in which the streets are to be graded or improved, and that the <br />DEVELOPER shall provide a financial guarantee to the CITY to provide for the actual <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.