My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/22/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 10/22/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:37:17 PM
Creation date
9/24/2003 2:44:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/22/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 3 · Site Work <br />20 Granular borrow CY 61t0 14.O0 <br />21 Cia.,;.,; 5 aggregale base TN' 60 I0.00 <br />22 Erosion control france in place LF 200 2.50 <br />23 Seed wfih mulch KC 0,? 1,209.LVd <br />24 Seed with fiber wood blanket SY 400 3.00 <br />25 12" CMP with 2 aprons LF 50 29.00 <br /> Part 3 - Sile Work <br /> <br /> Part 4 · Water Well No. 4 <br />26 Transpur6ng ti) and erecling on job <br /> site all necessary equipment, mater{als <br /> and tools and setting up same LS <br />2? Drive 30 inch custos including drive shoe LF <br />28 Drill 30 inch open hole LF <br />29 Place 24 inch casing inside casing and <br /> open hole LF <br />30 Furnish and place neat cement grout <br /> between casings and open drill hole CT <br />3J Dynamite for blasting including labor <br /> liar she.ting, caps and wire LB <br />32 Dr, il CY <br />33 /.'urni~, insull{ and remove air cnmpre.~.qon <br /> eqmpment Ibr air surging of the well L$ <br />34 Air surging nf ;he well HR <br />35 Purnish. install and remove test pump for <br /> <br /> capacity m.qt of well LS <br /> <br />36 Test pumping HR <br />37 Sterilize well, remove all to.is and <br />equipment, clean up site and weld on cap LS <br />Total Part 4 - Water: Well No. 4 " <br /> <br />Total Part I - Waler Well Text Drilling <br /> <br />Total Part 2 - Water Well No. 3 <br /> <br />Total Part 3 - She Work <br /> <br />Total Part 4 - Water Well No, 4 <br /> <br />Total Work Completed lo Date <br /> <br />1:\43fl',,43802LREQUEST.WB2 <br /> <br /> i <br />120 <br /> <br />lBO <br /> <br />160 <br /> <br />15 <br /> <br />20O <br /> <br />200 <br /> <br />1 <br /> <br /> 1 <br /> <br />gO <br /> <br />4,000.00 <br /> <br /> 143,00 <br /> <br /> 60.00 <br /> <br />57,00 <br /> <br />225 .tX) <br /> <br />10,00 <br /> <br />50.00 <br /> <br />2,800.00 <br /> 115,00 <br /> <br />1,500.00 <br /> <br />1,200.00 <br /> <br />9,380,~ <br /> 0.~ <br /> <br /> 0.00 <br />$9,380.00 <br /> <br /> I <br />I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />i <br />i <br /> <br />I <br />I <br />! <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.