|
BID SCHEDULE B - W~termain
<br />
<br /> Connect to Existing 12" ~Watermain
<br />
<br />2 12" DJ.P, Class 52
<br />
<br />3 8" DJ.P, Class 52
<br />
<br />4 6" DJ.P, Class 52
<br />
<br />5 Jack-bore 24" Dia. x 0.375 Steel Casing
<br />
<br />6 12" Valve
<br />
<br />7 8" Valve
<br />
<br />8 6" Valve
<br />
<br />9 Hydrant
<br />
<br />10 3" Insulation
<br />
<br />11 12" x 12" Tee
<br />
<br />12 12" x 6" Tee
<br />
<br />13 12" x 8" Cross
<br />
<br />14 12"-45 Degree Bend
<br />
<br />15 12"- 22 1/2 Degree Ben~l
<br />
<br />16 12". 11 1/4 Degree Bend
<br />
<br />17 12" Plug
<br />
<br />18 8" x 6" Tee
<br />
<br />19 8"- 11 1/4 Degree Bend.
<br />
<br />20 8" Plug
<br />
<br />21 6"x6"Tee
<br />
<br />22 6"-45 Degree Bend
<br />
<br />23 6"- 22 1/2 Degree Bend
<br />
<br />24 6" - 11 1/4 Degree Bend
<br />
<br />25 1" Corp., Stop & Box
<br />
<br />26 1" Copper Service Pipe
<br />
<br />27 Gate Valve Box Extension (Field Change)
<br />
<br />28 Gate Valve Rod Extensiol~ (Field Change)
<br />
<br />29 Hydrant Extension (Field Change)
<br />30 4" Insulation Board (Field Change)
<br />
<br />b TOTAL BID SCHEDULE B - VVatermain
<br />
<br />LS
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />SF
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />SF
<br />
<br /> 1.00
<br />1,465.00
<br />1,197.00
<br />775.00
<br />70.00
<br />5.00
<br />2.00
<br />11.00
<br />9.00
<br />
<br />128.00
<br /> 1.00
<br /> 3.00
<br /> 1.00
<br /> 1.00
<br /> 1.00
<br /> 2.00
<br /> 2.00
<br /> 5.00
<br /> 2.00
<br /> 2.00
<br /> 1.00
<br /> 1.00
<br /> 1.00
<br /> 1.00
<br /> 46.00
<br /> 1,930.00
<br /> 7.00
<br /> 7.00
<br /> 5.00
<br /> 240.00
<br />
<br />100.00
<br />22.00
<br />15.25
<br />12.05
<br />170.00
<br />850.00
<br />500.00
<br />375.00
<br />1,025.00
<br />1.20
<br />220.00
<br />220.00
<br />320.00
<br />200.00
<br />200.00
<br />200.00
<br />100.00
<br />125.00
<br />100.00
<br />75,00
<br />125.00
<br />100.00
<br />100.00
<br />100.00
<br />125.00
<br />
<br /> 7.50
<br /> 100.00
<br /> 120.00
<br /> 250.00
<br /> 1.70
<br />
<br /> 100.00
<br />32,230.00
<br />18,254.25
<br />9,338.75
<br />11,900.00
<br />4,250.00
<br />1,000.00
<br />4,125.00
<br />9,225.00
<br />153.60
<br />220.00
<br />660.00
<br />320.00
<br />200.00
<br />200.00
<br />400.00
<br />200.00
<br />625.00
<br />200.00
<br />150.00
<br />125.00
<br />100.00
<br />100.00
<br />100.00
<br />5,750.00
<br />14,475.00
<br />700.00
<br />840.00
<br />
<br /> 1,250.00
<br /> 408.00
<br />
<br />117,599.60
<br />
<br /> 1.00
<br />1,463.00
<br />1,194.00
<br />757.00
<br />70.00
<br />5.00
<br />2.00
<br />11.00
<br />9.00
<br />
<br />128.00
<br /> 1.00
<br /> 3.00
<br /> i.O0
<br /> 1.O0
<br /> 0.00
<br /> 0.00
<br /> 2.00
<br /> 5.00
<br /> 0.00
<br /> 2,00
<br /> 1.00
<br /> 1.00
<br /> 0.00
<br /> 1.00
<br /> 46.00
<br /> 1,822.00
<br /> 7.00
<br /> 7.00
<br /> 5.00
<br /> 240.00
<br />
<br /> 100.00,~'~
<br /> 32,186.oov'"
<br /> 18,208.50v""
<br /> 9,121.85,~"'
<br /> 11,90o.oo~"
<br /> 4,25o.oov-'''
<br /> 1,000.00~,''''
<br /> 4,i25.00~'''''
<br /> 9,225.00~''''
<br /> 153.~0~'''''
<br /> 22o.oo,..-"'
<br /> 660.00/
<br /> 320.00~''
<br /> 200.00~-~
<br />
<br /> 2oo.oov"
<br /> 625.00~,.,,''~
<br />
<br /> i50.00,,,,'~
<br /> 125.00v,,'~
<br /> 100.00,~
<br />
<br /> ~oo.oo,--'"
<br /> s,75o.oo ,-'""
<br /> 13,665.00~,~''
<br /> 700.00
<br /> 840.00
<br />
<br /> 1,250.00
<br />
<br /> 408.00
<br />
<br />115,582.95./"
<br />
<br />1
<br />
<br />2
<br />
<br />3
<br />
<br />4
<br />
<br />5
<br />
<br />6
<br />
<br />7
<br />
<br />8
<br />
<br />9
<br />
<br />lO
<br />
<br />11
<br />
<br />12
<br />
<br />13
<br />
<br />BID SCHEDULE C - Storm Sewer
<br />
<br />12" RGP, Class 5
<br />
<br />15" RGP, Class 5
<br />18" RCP, Class 5
<br />21" RCP, Class 3
<br />
<br />27" RCP, Class 3
<br />
<br />15" RC Apron
<br />
<br />27" RC Apron W/Trashguard
<br />Catchbasin, 2' x 3'
<br />Catchbasin, 48" Diameter ~
<br />Rip Rap, Class 3
<br />
<br />Geotexfile Fabric (MnDOT:Type III)
<br />Reconstruct Sedimentation Pond
<br />Grouted Rip Rap
<br />
<br />TOTAL BID SCHEDULE Q o Storm sewer
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />LF
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />EA
<br />
<br />CY
<br />
<br />SY
<br />
<br />HR
<br />
<br />CY
<br />
<br /> 0.00
<br />
<br />468.00
<br />
<br />129.00
<br />
<br /> 45.00
<br />
<br />115.00
<br />
<br /> 1.00
<br />
<br /> 1.00
<br />
<br /> 1.00
<br />
<br /> 5.00
<br />
<br /> 10.00
<br />
<br /> 10.00
<br />
<br /> 5.00
<br />
<br /> 8.00
<br />
<br />20.00
<br />22.00
<br />24.00
<br />30.00
<br />40.00
<br />400.00
<br />620.00
<br />950.00
<br />.1,000.00
<br />40.00
<br />2.00
<br />150.00
<br />77.50
<br />
<br />0.00
<br />10,296.00
<br />3,O96.O0
<br />1,350.00
<br />4,600.00
<br />400.00
<br />620.00
<br />950.00
<br />5,000.00
<br />400.00
<br />20.00
<br />750.00
<br />620.00
<br />
<br />28,102.00
<br />
<br /> 0.00
<br />
<br />485.00
<br />
<br />129.00
<br />
<br /> 49.00
<br />
<br />i21.00
<br />
<br /> 1.00
<br />
<br /> 1.00
<br />
<br /> i.O0
<br />
<br /> 5.00
<br />
<br /> 10.00
<br />
<br /> 10.00
<br />
<br /> 5.00
<br />
<br /> 8.00
<br />
<br />10,670.00J
<br /> 3,09G.00~'~
<br /> i,470.00'~
<br /> 4,840.00~
<br /> 400.00~
<br /> 62o.oo~-"'
<br /> 950.00%,,~
<br /> 5,000.00~
<br /> 400.00~,-''~
<br /> 20.00~'"""
<br /> 750.00~.-;~
<br /> 620.00;~'
<br />
<br />28,836.00V'/'
<br />
<br />Page 4 of 5
<br />
<br />q~
<br />
<br />
<br />
|