Laserfiche WebLink
Proposed <br /> <br />1997 Adopted Fixed AssetAequisitions <br /> SCADA System <br /> <br />Estimated <br />Cost <br /> <br />65,000 <br /> <br /> 65~000 <br /> <br /> [ Total Ist <br />Useful [ Year <br />Life ] Depreciation <br /> 20 3,250 <br /> <br />Total 1st <br /> Year <br /> Cost <br /> <br />68,250 <br /> <br />3,250 68~250 <br /> <br />1997 Adopted CIP ImproVements <br /> Extension to Commercial Aspahlt (McKinley Street) <br /> Watennain Looping (McKinley Street) <br /> Watermain Looping (Xkimo to Dysprosium) <br /> Well//4 <br /> <br />18,000 <br />73,000 <br />49,000 <br />325,000 <br /> <br />NOTE: The cost of the above projects will be funded through existing and projected WAC/Water Trunk Charges fi.om the Water Utility Fund. <br /> Depreciation will be calculated and charged accordingly. <br /> <br /> <br />