Laserfiche WebLink
Part 3 - SRe Work <br />20 Granular borrow <br />21 Class 5 aggregate base <br />22 Erosion control fence in pla~e <br />23 Seed with mulch <br />· 24 Seed With fibe2' Wo6d blanket <br />25 12~ CMP with 2 aprons <br /> Part 3 - Site Work <br /> <br />CY 680 <br />TN 60 <br />LF 2OO <br />AC 0.7 <br /> <br />. SY 400 <br /> <br />Lac 5O <br /> <br /> Part 4 - Water WeB No. 4 <br /> 26 Transporting to and erecting on job <br /> · Sit~ ali heee~'~quiPment; materials -'~'~:- :--: .... :.. <br /> and tools ~d s~tting up same ' LS <br /> <br />27 Drive 31) increasing incl':ding drive shoe LF <br />28 Drill 30 inch open hole LF <br />29 Place 24 inch casing inside casing and <br /> open hole LF <br />30 Furnish and place neat cement grout <br /> between casings and open drill hole CY <br />31 Dynamite for blasting including labor <br /> for shooting, caps and wire LB <br />32 Bail CY <br />33 Furnish, install and remove air compression <br /> equipment for air surging of the well LS <br />34 Air surging of the well HR <br />35 Furnish, install and remove test pump for <br /> <br /> capacity test of well LS <br /> <br />36 Test pumping HR <br /> <br />37 Sterilize well, remove all tools and <br /> equipment, clean up site and weld on cap LS I <br /> Total Part 4 - Water Well No. 4 <br /> <br /> 1 <br /> <br />120 <br />180 <br /> <br />I60 <br /> <br />15 <br /> <br />200 <br /> <br />200 <br /> <br /> 1 <br /> <br />100 <br /> <br /> 1 <br /> <br />80 <br /> <br />14.00 708 9,912.00 <br />t0.00 <br />2.50 .... "' ......... ' ........ ' <br />1,200.00 . ~ <br /> <br /> 29.00 <br /> <br />~ 9,912.00 <br /> <br />4,000.~ <br /> <br /> 143.~ <br /> <br /> ~.~ <br /> <br />57,00 <br /> <br />225 .IX} <br /> <br />10.00 <br /> <br />50.00 <br /> <br />2,8130.00 <br /> <br /> 115.00 <br /> <br />1,500.00 <br /> <br /> 100.00 <br /> <br />1,200.00 <br /> <br /> I <br /> <br /> I <br /> I <br /> I <br /> ! <br /> I <br /> I <br />I, <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Total Part 1 - Water Well Test Drilling <br /> <br />Total Part 2 - Water Well No. 3 <br /> <br />Total Pan 3 - Site Work <br /> <br />Total Part 4 - Water Well No. 4 <br /> <br />Total Work Completed to Date <br /> <br />1:\4{~2~U EST2.WB2 <br /> <br />15,940.00 <br />0.00 <br />9,912.00 <br />0.00 <br />$25,852.00 <br /> <br /> <br />