Laserfiche WebLink
I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Ramsey 1997 Proposed Water Utility Fund Budget Detail of Line Items <br /> <br /> 1994 <br />Actual I I 1995 <br /> Actual I I 1996 <br /> Adopted II 1997 <br /> Proposed <br /> I <br /> <br />1997 Adopted Fixed AssefAcquisifions <br /> SCADA System <br /> <br />I Estimated <br /> Cost <br /> <br />65,000 <br /> <br /> 65~000 <br /> <br /> I Total 1st <br />Useful Year <br /> Life Depreciation <br /> 20 3,250 <br /> <br />Total 1st I <br /> Year <br /> Cost <br /> <br />68,250 <br /> <br />3~250 68~250 <br /> <br />1997 Adopted CIP Improyements <br /> Extension to Commeroial Aspahlt (McKinley Street) <br /> Watermain Looping ('McKinley Strcc0 <br /> Watermain Looping CAXimo to Dysprosium) <br /> Well #4 <br /> <br />18,000 <br />73,000 <br />49,000 <br />325,000 <br /> <br />NOTE: The cost of ibc above projects will be funded through existing and projected WAC/Water Trunk Charges from the Water Utility Fund. <br /> Dcpreciatiorl will be calculated and charged accordingly. <br /> <br />~75 <br /> <br /> <br />