My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 12/10/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:38:26 PM
Creation date
9/24/2003 3:33:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />equipment cabinets placed on a 10' x 20' cement pad. She explained that the tower and cabinets will <br />be encompassed With an eight foot high chain link fence topped with three strands of barbed wire. <br />Ms. Frolik statedthat the site and access to it will be prepared with a gravel surface and there will <br />be no personnel stationed at the site. <br /> <br />Commissioner Jensen asked if the tower would be freestanding with no cables. Mr. Dyer replied <br />affirmatively. <br /> <br />Commissioner ThOrud asked if this would create any interference to residents. Mr. Dyer explained <br />that it would not. Ms. Frolik stated that she received information from the league of Minnesota cities <br />confirming that these types of towers are typically low power wattage. <br /> <br />Commissioner JenFen asked about maintenance regarding landscaping. Mr. Dyer explained that the <br />outsides of the cement will be rocked, so there will probably not be a problem with weeds. <br /> <br />Commissioner LaDue asked where American Portable Telecom was based. Mr. Dyer explained that <br />they have an offic~e in Bloomington, and a headquarters in Chicago, Illinois. Commissioner LaDue <br />asked if there wilt be more towers in the area. Mr. Dyer explained that there will be more towers, <br />as this is a networlt system. He added that they try to use existing structures when possible, such as <br />the buildings in downtown Minneapolis. <br /> <br />Commissioner Deemer stated that the comprehensive plan for Ramsey shows future extension of <br />County Road/ti 1~6 across the north portion of the property, so he would like to see the fence built <br />60 feet from the north property line. <br /> <br />Commissioner Deemer asked if the three strands of barbed wire is allowed. Ms. Frolik stated that <br />there were no restrictions regarding the barbed wire. Mr. Dyer explained the purpose of the barbed <br />wire is to keep people out, and he explained that there will be an alarm system installed as well. <br /> <br />Commissioner Deemer asked if there would be any problem with leasing the property further south <br />to accommodate ifuture road expansions. Mr. Dyer stated that he did not think that would be a <br />problem, but may make some modifications to their plan necessary. <br /> <br />The Planning Commission proceeded to review the Findings of Fact. <br /> <br />Motion by Commissioner Holland and seconded by Commissioner Jensen to amend #1 through #19 <br />in the affirmative. <br /> <br />Further Discussion: Commissioner Thorud asked if there were any lighting requirements. Mr. Dyer <br />explained that the lower was not exceeding 200 feet, so there were not any lighting requirements. <br /> <br />Motion carded. Voting Yes: Chairperson Bawden, Commissioners Holland, Jensen, Deemer, <br />LaDue, Terry, and Thorud. Voting No: None. Absent: None. <br /> <br />Planning Commission/September 3, 1996 <br /> Page 11 of 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.