My WebLink
|
Help
|
About
|
Sign Out
Home
08/22/96
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Business Park 95 Architectural
>
Full Agenda
>
1996
>
08/22/96
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 9:38:28 AM
Creation date
9/25/2003 12:15:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Business Park 95 Architectural Review Board
Document Date
08/22/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br />RIYEW OF SITE PLAN FOR BARKELA MANUFACTURING; <br /> CASE OF SHARP AND ASSOCIATES <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />Sharp and Associates has been retained by Barkela Manufacturing to prepare a site plan for their <br />new office/man~ufacturing facility to be constructed in Business Park 95 3rd Addition on the north <br />side of McKinl~. y Street, just east of the Automated EDM site. The following items are enclosed <br />for your information: <br /> <br /> a) Site location map <br /> b) Site plan <br /> <br />The site plan hlas been reviewed for compliance with City Code standards and has received <br />approval from the City of Ramsey Planning Commission and City Council. <br /> <br />Observations: <br /> <br />The proposed facility is 9,100 square feet in size. The following is a critique of the site plan as it <br />pertains to SectiOn 2 of the Business Park 95 Covenants: <br /> <br />The exterior finrish on the building is proposed to be a combination of rock and smooth face <br />concrete block ~ith a pre-finished metal panel application to the top 1/3 of the structure, which is in <br />accordance with Ithe covenants. <br /> <br />The total square !~ootage of the proposed structure does not exceed the 35% lot coverage restriction <br />established in the covenants and City Code. The covenants restricts the aggregate impervious <br />surface (buildings and pavement) of the lot to 85% of the lot area. The area of the building and <br />paved surfaces totals approximately 25,244 square feet, which is equal to 41% of the lot. <br /> <br />Outdoor waste s[orage areas are required to be 100% screened. The site plan proposes a concrete <br />block enclosure with chain link gates retrofitted with colored slat~. <br /> <br />In accordance with the covenants, all parking, loading, unloading and maneuvering areas will be <br />paved and finished with B-612 concrete curbing. <br /> <br />Recommendation: <br /> <br />The Ramsey City Council, Planning Commission and City Staff recommend site plan approval as <br />proposed. <br /> <br />Board Action: <br /> <br />Motion to: <br />Approve/deny Sharp's site plan for the Barkela facility and direct City Staff to notify the <br />Applicant of said approval in writing. <br /> <br />Bus Pk 95: 8/22/96 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.