Laserfiche WebLink
01. SITEWORK <br /> <br />FOX PARK <br /> <br />BUDGET <br /> <br />PROPOSAL <br /> <br />Grading and re-seeding with turf grass. <br /> Assumes most labor by City. <br /> <br />Landscaping <br /> Tree relocation <br /> Shade trees, planted. <br /> Other ornamentals, planted. <br /> Prairie restoration <br /> <br />(6 @ $65) 390 <br />(8 @ $150) 1,200 <br />(20 @ $50) 1,000 <br />(.64 ac @ $2911/ac) 1,860 <br /> <br />8' Bituminous path <br /> <br />(1220' @ $6/1.f.) <br /> <br />Wetlands Boardwalk (See attached cost breakdown) <br /> Assumes installation by City. <br /> <br />02. EQUIPMENT <br /> <br />01. Subtotal <br /> <br />Benches <br /> <br />Tables <br /> <br />Trash cans <br /> <br />Signage <br /> <br />(7 @ $200) <br />(2 @ $250) <br />(3 @ $111) <br /> <br />Entry sign and planter <br />Advisory and Educational signage <br /> <br />Play Equipment <br /> <br />Wildlife habitat <br /> <br />Bike rack <br /> <br />(Donated.) <br /> <br />(Relocate existing.) <br /> <br />02. Subtotal <br /> <br />03. SPORTS FACILITIES <br /> <br />Tennis Court <br /> Assumes grading included. <br /> <br />03. Subtotal <br /> <br />51/ <br /> <br />4,450 <br /> <br /> 7,320 <br />20,234 <br />32,504 <br /> <br />1,411 <br /> 500 <br /> <br /> 300 <br />1000 <br /> <br />18,933 <br /> <br /> -0- <br /> <br /> -0- <br /> <br />22,133 <br /> <br />15,000 <br /> <br />CONSTRUCTION SUBTOTAL <br /> <br />5% CONTINGENCY <br /> <br />TOTAL <br /> <br />69,637 <br /> <br /> 3,665 <br />73,302 <br /> <br /> <br />