Laserfiche WebLink
CASE #3 <br /> <br /> UPDATE PARK & TRAIL PLAN <br />By: Mark Boos, Parks/Utilities Supervisor <br /> <br />Background: <br /> <br />City Staffis in t~e process of updating the 11" x 17" Park & Trail Plan Maps. These maps which <br />are enclosed with your agenda, were last revised early in 1995. Since then, several trail segments <br />have been comlSleted; and in some cases, oppommities for proposed park areas or trails have <br />been lost. The purpose of this case is to update the map. After the new map is prepared, copies <br />will be distribut{d to Council, Commissions, and Staff. Recommended changes include; <br /> <br />1. Change sidewalk from Sunwood Drive south on Potassium Street to existing from proposed. <br />2. Change SunWood Drives on-road B from proposed to existing from Wood Pond Hills to <br /> Sunfish Lake Boulevard. <br />3. Add existing on-road B north of County Road//116 on Sunfish Lake Boulevard to 143rd <br /> Lane. <br />4. Add existing.on-road B along 153rd Avenue and Sunfish Lake Boulevard at Fox Knoll 2nd <br /> Addition. <br />5. Add existing ~n-road B west of Trunk Highway//47 on 153rd Avenue to City Hall. <br />6. Add proposed on-road B from Autumn Heights south along County Road 83 to 153rd <br /> Avenue and west to Lake Itasca (identified as part of the five-year CIP in 1995). <br />7. Add proposed on-road B between County Road #5 and Trunk Highway #47 along Sunwood <br /> Drive (neglected on original plan). <br />8. Other. <br /> <br />Reviewed by: <br />Parks/Utilities Supervisor <br /> <br />PR:I 1/14/96 <br />/ccr <br /> <br /> <br />