My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/04/1996
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1996
>
Agenda - Planning Commission - 03/04/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:00:20 AM
Creation date
9/25/2003 3:31:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/04/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33. <br /> <br />37. <br /> <br />40. <br /> <br />41. <br /> <br /> Rcstri¢.tcd Materials. No wasm materials shall be stored on the site which are not utilized in <br /> the album processing operation or properly identified as materials incidental to the <br /> processing operation. Such materials am limited to aluminum, brass, copper, stainless steel <br /> and o~¢r non hazardous metals received as a small portion (less than 10% by volume) of an <br /> all,minim feedstock load. <br /> <br /> l:[_ir¢ Egtin~uishers. The Permit Holder shall, at all times, have a sufficient supply of f-n-e <br /> extingu~s,~ hdrs located throughout the operation in conformance with the Uniform Fire Code. <br /> <br /> ]~ir¢ L~es. The Permit Holder shall properly construct and maintain all season paved fire <br /> lanes o~' properly pave and maintain drives and clearances to serve as fire lanes for the street <br /> side of./li¢ property to the back of the property. <br /> <br /> Cor~tingcnc_v Action Plan. The owner or operator must prepare and maintain a contingency <br /> action ~lan for the aluminum processing facility. The plan must discuss what specific actions <br /> will be [taken if a i'm:, spill or release occurs at the facility and that back-up system exists if <br /> porfion~; of the facility am closed for any period of rime. The plan must also identify a <br /> respon ,/ible contact person or persons for the facility who could bi: re. ached 24 hours a day in <br /> the eye,at of a tim, spill, release or other serious problems along with their home addresses <br /> and phone numbers. <br /> <br /> Hours Of Operation. Thc Permit Holder may conduct his receiving operations within thc <br /> hours o~ 7:00 a.m. to 8:00 p.m. Monday through Saturday, and may conduct aluminum melt <br /> operations 24 hours a day, seven days a week unless the operations present a nuisance or <br /> disturbineighboring land uses. The City Conncil may limit hours of operation to pi'otect <br /> neighbOring land uses. <br /> <br /> Trailcr/Wehicl¢ Storage; The use of trailers, tracks or vehicles for long term storage (longer <br /> than 30/consecutive days) is prohibited. All vehicles and trailers on site must bear a current <br /> license," be registered, and must be road worthy. <br /> f <br /> <br />.$.tm¢ .tu~. s aug $it¢ Improvements. The placement, design and construction of new structures <br />or addi[:ions to existing sunactures and site improvements shall comply with City Code as <br />provid~l within the development agreement, and applicable state codes and OSHA' <br />requirements. <br /> <br />B.~ildin~ Permits. No building permit for the site will be issued until: 1) the southerly half of <br />142nd ,Avenue N.W. is improved from .la.spar Street N.W. to 160' west of the N.E. comer <br />of Lot ;2, Block 1, Gateway North Industrial Park; and 2) Cash or Letter of Credit is <br />deposit~cl with the City in an amount equal to 150% of the City Engineer's estimated cost of <br />impm. v~n. g all of 142nd Street N.W. from ~Iaspar Street N.W. to Limonite Strut N.W. to City <br />standa:r~ls with the exception of bituminous surface. No certificate of occupancy for <br />occupancy of any building on the site will be issued until 142nd Avenue N.W. has been <br />improv./d to City standards and accepted by the City except that bituminous surface is not a <br />requimaaent for a Certificate of Occupancy to be permitted. The Permit Holder herein agrees <br />to join ~ petitions for all such, roadway improvements when such petitions are assemble& <br /> <br />.$.anita.w Sewer. The Permit Holder agrees to connect to City sewer and water at the time <br />sewer 4nd water is extended to the area and herein agrees to join in a petition for such <br />improvements when such petitions are <br /> <br />Work ~d Storage Operation Enclosed. All operations must be within a fully p¢:rmanently <br />cnclosdi building. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.