My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/04/1996
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1996
>
Agenda - Planning Commission - 06/04/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:00:51 AM
Creation date
9/25/2003 3:52:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/04/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br />CASE <br /> <br /> REQUEST FOR SITE PLAN REVIEW; <br />OF DAVID HAUAN, DAVE'S CUSTOM DIGGING <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />Dave Hauan is requesting site plan approval to construct a 1,568 office building with <br />outside storage for trucks and equipment on Lot 3, Block 2, HY- 10 Ramsey Addition <br /> <br /> a) Site location map <br /> b) i Site plan, topography plan, foundation plan, building elevations, plot plan <br /> and floor plan <br /> c) City Staff review letter dated May 28, 1996 <br /> <br />Observations: <br /> <br />The office btv21ding is designed to front on Armstrong Blvd., but access would be derived <br />from 146th Avenue. The office structure is proposed at 1,568 square feet and the exterior <br />walls will be ~onstructed of vinyl siding with brick trim on the building front. The building <br />meets the structure setback requirements from Armstrong Blvd., 146th Avenue and <br />property line~. <br /> <br />The site will be served by on-site septic and well. <br /> <br />City Code requires a 20 foot wide landscaped area along all streets and outside storage <br />must be screeged from public roms. The site plan text proposes a screening along <br />Armstrong Bl~vd. and 146th Avenue to consist of 5'-6' pine trees spaced 10 feet apart. The <br />site plan should be modified to verify that the 20 foot wide yard along Armstrong and <br />146th is provii:led. Staff is also suggesting that some plantings be established along the <br />building front!and a 5 foot berm be constructed along Armstrong Blvd. and 146th to <br />intensify the ~fect of the tree screening. <br /> <br />In accordance~with City Code, the customer/employee parking lot is proposed to be paved; <br />the site plan s§ould be modified to provide B-612 concrete curbing around the perimeter of <br />the parking lot~. Mr. Hauan is requesting a waiver from the Code requirement to pave the <br />outside storag~ yard for tracks and equipment In the past, the Planning Commission and <br />Council have i~educed this requirement to Class 5 in the heavy industrial districts. <br /> <br />If the waste storage area is to be outdoors, the site plan must be modified to provide for a <br />screened container. <br /> <br />The City Engi?eer is requiring a Drainage Plan to provide a detention pond in the northeast <br />comer of the site to limit runoff to the site's predevelopment condition. Material excavated <br />for the pond could be used to construct the screening berm. <br /> <br />Recommendation: <br /> <br />City Staff recommends site plan approval contingent upon compliance with City Staff <br />review letter. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.