My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/01/1996
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1996
>
Agenda - Planning Commission - 10/01/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:01:33 AM
Creation date
9/26/2003 8:51:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2o <br /> <br />Therefore, Mr. Rick Keillor of Vanman Companies and Mr. Jim Johnson of Bolton & Menk, Inc. (BMI) <br />have been retained by Lord of Life Lutheran Church to provide the technical expertise and guidance to the <br />Long Range Planning Committee in the development of the Campus Master Plan-Mr. Keillor with respect <br />to the building facilities and Mr. Johnson with respect to access and parking facilities. However, all <br />components of that Master Plan have a strong inter-relationship and must be closely coordinated. <br /> <br />This "Traffic Engineering Study for the Lord of Life Lutheran Church Master Plan" will provide design <br />guideline and recommendations on the following traffic issues to be used by the Planning Committee in <br />the preparation of their Capital Improvement Budget or Development Framework/Schedule of the Campus <br />Master Plan: <br /> <br />i 1. Trip Generation/Trip Distribution; <br />' 2. Access; and <br />: 3. Site Improvements including: <br /> a) Intersection Geometries; <br /> b) Internal Road System; and <br /> c) Parking Facilities. <br /> <br />TRIP GENERATION/TRIP DISTRIBUTION <br /> <br />Lord of Life Lutheran Church is situated on an approximate 35 acre site in the northwest quadrant of the <br />intersection of Trunk Highway #47 and County State Aid Highway #5 (Nowthen Boulevard) in the City <br />of Rarnsey as shown on Exhibit A. The current church facility is served by a singie 24' wide driveway <br />access (1 entering and I exiting lane) onto CSAH ~ at approximately 145th Avenue. <br /> <br />On the typical Stmday morning, the approximately 10(K) parishioners attending one of the four (4) regularly <br />scheduled worship services are generating about 1000 trip ends - 500 vehicles coming to church and 500 <br />vehicles leaving after church - based on a counted vehicle occupancy rate of 2 persons per vehicle. That <br />volume occurs primarily between the hours of 7:30 AM and 1:00 PM, but peaks at about 400 trip ends <br />between 9:45 and 10:45 AM which occurs between and overlapping the two (2) largest services at 9:00 <br />AM and 10:15 AM. <br /> <br />Based on the below listed membership projections contained in the Vision 2005 Strategic Plan and assuming <br />a continued church attendance rate at appro~qmately 50% of the membership and a continued occupancy <br />rate of 2 persons per vehicle, the following number of.trip ends can be expected each Sunday: <br /> <br /> TABLE II <br /> PROJECTED CHURCH MEMBERSHIP, ATTENDANCE & TRIP ENDS <br /> <br />YEAR PROJECTED PROJECTED PROJECTED NO. OF <br /> MEMBERSHIP ATI'ENDANCE TRIP ENDS <br />1995 2161 1000 i000 <br /> (Actual) (Actual) <br />1996 2696 1350 1350 <br />1997 3235 1600 1600 <br />1998 3882 1950 1950 <br /> <br />2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.