Laserfiche WebLink
reinforced concrete pipe strength specificatiOn. The culvert shall be installed within 45 <br /> 2days of the issuance of the permit so that it will be functional to handle <br /> precipitation/melt events which occur in the spring of 1997. <br /> <br />2. The applicant shall stabilize the back slopes of the fill over those sections of the <br /> roadway which have been elevated more than 12 inches from the filling.. This shall be <br /> : done by placing straw over the roadway and backslopes, .and seedi_'ng the b.ac~lol~, ,~d_ <br /> outermost five feet of the roadway with oats or annual rye. ri'his worst snoma oe <br /> ; completed prior to April 15, 1997. <br /> 3.! The applicant shall regrade all borrow areas such that the slope is no greater than three <br /> horizontal to one vertical. The slopes should be seeded with oats or annual rye and <br /> : mulched with straw. This work should be completed by June 15, 1997. <br /> <br />Commission Action: <br />~otion to recommend City Council approve findings of fact and adopt proposed p~rnit. <br />Reviewed By: <br /> <br />City Engineer <br />Zoning Administrator <br />City Administrator <br /> <br />PC: 12-3-96 <br /> <br />£dtan <br /> <br /> <br />