Laserfiche WebLink
Date~ <br />Project: <br />Cont~actor: <br />Current Contract Amount: <br />Award Date: <br /> <br />FINAL PAY ESTIMATE NO. 3 <br /> <br />January lS, I995 <br />I.P. g94-17: Ramsey-AnokaWaterSystemlnterconnect <br />W. B. Miller, Inc. <br />$39,514.00 <br />June 28, 1994 <br /> <br />The following work has been completed on the above referenced project: <br /> <br />Quantity Unit Price Extension <br /> <br />268 ft. 28.00/ft. $ 7,504.00 <br />1 ea. 350.00/ea. 350.00 <br />20 ft. 19.50/ft. 390.00 <br />1 ea. 2,000.00/ea. 2,000.00 <br />1 ea. 1,100.00/ea. 1,100,00 <br /> <br />$ti,344.00 <br /> <br />IteTM <br /> <br />sCHEDULE A: <br /> <br />12" Ductile Iron Warerrnain <br />6" Gate Valve <br />6" Ductile Iron Watem~ain <br />Standard Hydr~t <br />12" Butterfly Valve* <br /> <br /> i SUBTOTAL SCHEDULE A: <br /> <br />S CH EDULE B: <br /> <br />10" Ductile Iron Watermain <br />$" DUctile Iron Watermain <br />8" Gate Valve <br />Meter Manhole <br />Ductile Iron Watermain Fittings <br />10" Butterfly Valve* <br />RestOration <br /> <br /> ~ SD~TOTAL SCHEDULE B' <br /> <br />To~ Work Completed to Date: <br />Les~ 5 % Retainage: <br />Less:;Prevmus Payments: <br /> <br />TOTAL DUE THIS PAYMEN~I': <br /> <br />Ramsey-Anoka <br /> <br />230 ft. 24.00/ft. $ 5,520.00 <br />35 ft. 20.00/ft. 700.00 <br />2 ea. 425.00/ea. 850.00 <br />Lump Sum ~ 17,000.00 17,000.00 <br />1,200 lbs. 1.00/lb. 1,200.00 <br />1 ea. 725.00/ea. 725.00 <br />Lump Sum 4,000.00 4,000.00 <br /> <br />Water System Interconnect/Final Pay Estimate #3 <br /> Page 1 of 2 <br /> <br />$29,995.00 <br /> <br />$41,339.00 <br /> 0.00 <br /> 39.272.05 <br /> <br />$ 2.066.95 <br /> <br /> <br />