My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 02/14/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:33:20 PM
Creation date
9/26/2003 10:00:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LP~ - Policy ~8-B <br />I l'age 7 I <br /> 10.~ The following items are to be a~se. ssable as part of'a reconstruction project cos/::. <br />I~-'' 1, Remove concrete curb and gutter I <br /> <br />I <br /> I <br /> I <br /> I <br /> I <br />il <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />2. Remove concrete pavement <br />3. Remove/replace concre~ steps <br />4. Construct a~d reinforce concrete ~teps <br />5. Remove concrete driveway pavement <br />6. Remove/construct apron 6' thick concrete pavement (residential) <br />7. Remove/construct apron 8" thick concrete pavement (commercial) <br />8. Common excavation <br />9. Core excavation <br />10. Construct concrete I2 & G Design 13-618 or surmountable <br />1L Sawjo'mt in concrete <br />12. Adjust manhole~ <br />I3. Adjust catch basin <br />14. Adjust gate valves <br />15. Retaiu3ng wall <br />16. ~ect:ric conduit <br />17. Construct 4' x 8~ tMek valley cone gutter <br />18. Surfaelng ag, gr. Cl. 2 100% crushed <br />19. Cultured sod with 4' thick topsoil in place <br />20. Clearing <br />21. Grubbing <br />22, ' Aggregate backfill <br />23. Replacement o1' driveway aprons <br />24. Construct concrete pedestrian ramps <br /> <br />The following items would not be included in a reconstruction project cost.. The items will be billed <br />directly or assessed to the benefitted property: <br /> <br />2. <br />3. <br />4. <br /> <br />Sewer and water ~rvice line repairs <br />Random 6-8' concrete pavement <br />Random eoncrete sidewalk <br />Random sod <br /> <br />The following items will be paid at clty expense when part of a reconstruction project: <br /> <br />Z <br />3. <br />4. <br /> <br />Remove, replace or relocate hydrants <br />Install hydrants and/or gate valves <br />Sanitary sewer and water mains repair and replacement <br />Storm sewer reconstruction or construction <br /> <br />ASSESSMENT FORMULAS <br /> <br />Ii <br /> <br />The adjusted front foot method of asse.~sment uses the actual frontage or adjusts lots to an average <br />frontage by using area ratios or the average lot frontage in the project area. When the adjusted front <br />foot method is used, the jndivlduat lot assessment shall be calculated as follows: <br /> <br /> Aase. ssment = .Total Project Co~;t X Assessable Adjusted Front <br /> Total Adjusted Footage of Lot <br /> ~ Front Footage <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.