Laserfiche WebLink
LP~ - Policy ~8-B <br />I l'age 7 I <br /> 10.~ The following items are to be a~se. ssable as part of'a reconstruction project cos/::. <br />I~-'' 1, Remove concrete curb and gutter I <br /> <br />I <br /> I <br /> I <br /> I <br /> I <br />il <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />2. Remove concrete pavement <br />3. Remove/replace concre~ steps <br />4. Construct a~d reinforce concrete ~teps <br />5. Remove concrete driveway pavement <br />6. Remove/construct apron 6' thick concrete pavement (residential) <br />7. Remove/construct apron 8" thick concrete pavement (commercial) <br />8. Common excavation <br />9. Core excavation <br />10. Construct concrete I2 & G Design 13-618 or surmountable <br />1L Sawjo'mt in concrete <br />12. Adjust manhole~ <br />I3. Adjust catch basin <br />14. Adjust gate valves <br />15. Retaiu3ng wall <br />16. ~ect:ric conduit <br />17. Construct 4' x 8~ tMek valley cone gutter <br />18. Surfaelng ag, gr. Cl. 2 100% crushed <br />19. Cultured sod with 4' thick topsoil in place <br />20. Clearing <br />21. Grubbing <br />22, ' Aggregate backfill <br />23. Replacement o1' driveway aprons <br />24. Construct concrete pedestrian ramps <br /> <br />The following items would not be included in a reconstruction project cost.. The items will be billed <br />directly or assessed to the benefitted property: <br /> <br />2. <br />3. <br />4. <br /> <br />Sewer and water ~rvice line repairs <br />Random 6-8' concrete pavement <br />Random eoncrete sidewalk <br />Random sod <br /> <br />The following items will be paid at clty expense when part of a reconstruction project: <br /> <br />Z <br />3. <br />4. <br /> <br />Remove, replace or relocate hydrants <br />Install hydrants and/or gate valves <br />Sanitary sewer and water mains repair and replacement <br />Storm sewer reconstruction or construction <br /> <br />ASSESSMENT FORMULAS <br /> <br />Ii <br /> <br />The adjusted front foot method of asse.~sment uses the actual frontage or adjusts lots to an average <br />frontage by using area ratios or the average lot frontage in the project area. When the adjusted front <br />foot method is used, the jndivlduat lot assessment shall be calculated as follows: <br /> <br /> Aase. ssment = .Total Project Co~;t X Assessable Adjusted Front <br /> Total Adjusted Footage of Lot <br /> ~ Front Footage <br />I <br /> <br /> <br />