Laserfiche WebLink
22. <br /> <br />Surface ~and Stormwater <br /> <br />The pro~ect will~ generate, increased 'stormwater runoff by <br />virtue of the paved roadway surface, The 40' paved roadway <br />will co~pr~se0approximately,8,7 acres of impervi?us surface, <br />Figure 1~ lndlcates~the typical street section with drainage <br />directed~to ditches either side of the roadbed, The outlets <br />for these ditches would be to the wetlands thus retaining the <br />natural ~rainage patterns, An outlet control structure may <br />be requised for Wetland 656W which would control the.level of <br />the wetland, This wetland drains generally to the northeast <br />to Co, Ditch 66 & 3, '' <br /> <br />The middle segment of'the proposed project south of 153rd Lane <br />may be d~signed with curbs providing more positive control of <br />runoff, '~o significant impacts to stormwater runoff or Water <br />quality are anticipated as a result of this project, <br /> <br /> <br />