Laserfiche WebLink
FOX PARK BUDGET PROPOSAL <br /> <br />01. SITEWORK <br /> <br />Grading and re-seel~ling with turf grass. <br /> Assumes most labor by City. <br /> <br />500 <br /> <br />Landscaping <br /> Tree relocation <br /> Shade treesi planted. <br /> Other omar~entals, planted. <br /> Prairie restOration <br /> <br />8' Bituminous path <br /> <br />Wetlands Boardwalk <br /> Assumes installation by City. <br /> <br />(6 @ $65) 390 <br />(8 @ $150) 1,200 <br />(20 @ $50) 1,000 <br />(.64 ac.@ $2900/ac) 1,860 <br /> <br />(I220' @ $6/1.f,) <br /> <br />(See attached cost breakdown) <br /> <br />01. Subtot~ <br /> <br />02. EQUIPMENT <br /> <br />Benches <br /> <br />Tables <br /> <br />Trash cans <br /> <br />Signage <br /> <br />(7@$200) <br />(2@$250) <br />(3@$100) <br /> <br />Entry sign and planter <br />Advisory and Educational signage <br /> <br />Play Equipment <br /> <br />Wildlife habitat <br /> <br />Bike rack <br /> <br />(Donated.) <br /> <br />(Relocate existing.) <br /> <br />02. Subtot~ <br /> <br />03. SPORTS FACILITIES <br /> <br />Tennis Court <br /> Assumes grading included. <br /> <br />03. Subtot~ <br /> <br />4,450 <br /> <br /> 7,320 <br />20,234 <br />32,504 <br /> <br />1,400 <br /> 5OO <br /> <br /> 3OO <br />1000 <br /> <br />18,933 <br /> <br /> -0- <br /> <br />22,133 <br /> <br />15,000 <br /> <br />CONSTRUCTION :SUBTOTAL <br /> <br />5% CONTINGENCY <br /> <br />TOTAL <br /> <br />69,637 <br /> <br /> 3,665 <br />73,302 <br /> <br /> <br />