Laserfiche WebLink
I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br />I <br /> <br />By: <br /> <br /> CITY HALL REMODELING <br />Ryan Schroeder, City Administrator <br /> <br />CASE # <br /> <br />7 <br /> <br />Background: ~ <br /> <br />This issue impadts all Staff housed in City Hall. Those Staff have all been notified of the plans <br />to redesign and ~ill have seen this case and concept drawings prior to the meeting. All Staff <br />was given the o~portunity for input. The Police Department have received the two concept <br />plans prior to th~s case. <br /> ? <br />On May 25, 19~3, the City hired the firm of Boarman, Kroos, Pfister and Associates to <br />conduct a spacd, needs study for Public Works, Police, and Fire facilities. The study was <br />completed in July 1993. The study provided for the following projects and costs (both hard <br /> <br />and soft costs): <br /> <br /> Public Works <br /> Police <br /> Fire <br /> City Hall <br /> Total fadility needs ranged from: <br /> <br />$1,333,800 to $2,442,700 <br />$1,198,400 to $1,341,800 <br />$286,900 <br />$0 to $305,900 <br />$2,819,100 to $4,034,100 <br /> <br />A year later, th~Minnesota Sawdust Plant at 14100 Jaspar Street N.W. became available. We <br />purchased the b~ildings and grounds (to house the Public Works Department) for $310,000 <br />and budgeted $$80,000 for remodeling. The $590,000 cost is a significant savings over new <br />construction, bOt does not include shop equipment (which is part of the capital budget <br />discussion each !year). <br />City Staff has been deliberating over the prospect of meeting facility needs of the other <br />departments no~v that Public Works appears to be taken care of. Projected in the Capital <br />Improvements ~rogram are planning allocations of $40,000 in 1996 and 1997, with a <br />$1,100,000 prol~'osed construction project in 1998. It is important to note, however, that there <br />is not an identif~d funding source for this project. <br /> <br />This spring, Ra~nsey hired an intern, Beth Malaby, with architectural background. Given this <br />opportunity, sh~ was assigned to the project of providing City Hall remodeling scenarios <br />utilizing our existing building footprint. She has provided two preferred Police Department <br />remodeling sch{matics which are attached for your review. Metro Systems, an office supply <br />company, will l~e supplying schematics for modular furnishings for Community Development, <br />Administrative ~ervices, and the Finance Departments. The same will occur for the Police <br />Department sh4uld a project go forward from this point, (At the time of this writing, the <br />furnishing concepts are not yet available, but will be included herein.) <br /> <br />The intent of t~e above is to provide for our facility needs (but for Public Works dealt with <br />earlier, and fir~ over the next ten years. It is further intended to work within the existing <br />facility fund bal~ance of $130,000 in order to avoid an expenditure for a new Police Department <br />or City Hall exI~,ansion in a much greater cost. It is expected that the Fire Department will need <br />to be reviewed tn the near term for either expansion of the current facility or a satellite station <br />outside of this durrent proposed project. All Staff persons affected by this proposal have had <br />the opportunity )'or input into design concepts. At this point, all Staff has not seen the finished <br />drafts. <br /> <br />Police Denartment <br /> <br />One of two cogcepts are suggested to allow for expansion of the Police Department. The <br />concept preferr~, d by the department is to expand their existing space utilizing the Council <br />Chambers. Th~ result is shown as Exhibit "A", which would result in moving the Council <br /> <br /> <br />