My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/19/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 07/19/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:17:22 AM
Creation date
7/15/2011 9:05:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional storage capacity in the system. The elevation of the outlet pipe under 156th Lane controls the water <br />elevation of this pond and the one adjacent to the subject property. This would require removal of trees and export <br />of soil. The estimated cost for this work is $60,000. <br />Option 3 <br />The elevation of the pipe under 156th Lane is controlled by the elevation of storm sewer installed as part of the <br />Reilly Estates subdivision. The outfall of this pipe is approximately 14 feet below the elevation of the Pond B. <br />Lowering the outlet elevation of Pond B would require removing and replacing all of the pipe. The pipe is covered <br />in most areas by drainage and utility easements; however, additional easements would be required for removal and <br />replacement of the pipe. There would be significant restoration costs associated with this option, the route passes <br />through a park and landscaped yards, in addition to two street crossings. An alternate may be directional drilling a <br />pipe along the right of way for 156th Lane and Juniper Ridge Drive then connecting to the existing pipe before it <br />enters the river. This pipe would provide flow for smaller events, larger events would continue to flow through <br />the existing storm sewer. The estimated cost for replacing the pipe is $150,000 plus easements. We are working <br />on prices for directional drilling a pipe in the street right of way. <br />Discussion <br />Replacing the drainfield would address the immediate concerns of the resident. This could set a precedent for <br />replacing drainfields adjacent to other ponding areas in the city. Enlarging Pond B would provide additional storage <br />in the storm sewer system. Replacing the existing storm sewer or installing an additional pipe would provide long <br />term relief and lower the water level in Pond B which would lower the water level adjacent to 5220 156th Lane. <br />Funding Source: <br />The funding source for these proposed improvements would be the storm water utilty fund. <br />Staff Recommendation: <br />This case was brought forward in response to a request from the residents at 5220 156th Lane NW. Staff <br />recommends further investigation of each of these option before recommending one for construction. Options 2 or <br />3 if selected should be included in the Capital Improvement Program so they can be included in the budget. <br />Committee Action: <br />Committee action based on discussion. <br />Area Overview <br />Lot Detail <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson MaryJo Warner 07/14/2011 03:21 PM <br />Kurt Ulrich Kurt Ulrich 07/14/2011 03:44 PM <br />Form Started By: Len Linton Started On: 07/14/2011 10:07 AM <br />Final Approval Date: 07/14/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.