Laserfiche WebLink
Public Works Committee 5. 3. <br />Meeting Date: 07/19/2011 <br />By: Grant Riemer, Engineering/Public <br />Works <br />Title: <br />RFP for Parking Ramp and Parking Lot Snow Removal at the Municipal Center <br />Background: <br />Currently the municipal parking ramp and lots are cleared by splitting staff time between the streets supervisor and <br />the public works mechanic. This arrangement works well, if there are no problems in the plowing operation. If a <br />problem does occur in the overall plowing operation, one or both people are often needed to make repairs and <br />reassign staff and equipment to keep the operation moving, which means pulling off the municipal site. In past <br />seasons, the upper floors of the ramp were not occupied and plowing could be delayed until staff time was available <br />to complete the job. With the reduction of staff at public works and the future need for 24 hour residential parking <br />in the ramp, staff feels they will not be able to provide the level of service needed. The proposed contract length <br />would be 2 years. <br />Notification: <br />Observations: <br />Funding Source: <br />General Fund contracted services 0312 for plowing the surface lots <br />9240 for the Parking Ramp plowing <br />Staff Recommendation: <br />Direct staff to advertise for RFP <br />Committee Action: <br />Motion to full council to recommend RFP for contracted snow removal services for municipal parking ramp and <br />parking lots at the municipal center <br />RFP <br />Snow removal agreement <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson MaryJo Warner 07/14/2011 03:46 PM <br />Kurt Ulrich Kurt Ulrich 07/14/2011 04:06 PM <br />Form Started By: Grant Riemer Started On: 07/12/2011 10:18 AM <br />Final Approval Date: 07/14/2011 <br />