My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 07/19/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 07/19/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:17:22 AM
Creation date
7/15/2011 9:05:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
07/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roadway Type Route Speed <br />(MPH) <br />Anoka County Highway Department <br />Access Spacing Guidelines <br />Intersection Spacing Signal <br />INominal(4)) Spacing <br />Full Movement Conditional Secondary <br />Intersection Intersection (2) <br />Principal Arterial 50 - 55 1 mi. 1/2 mi. 1 mi. <br />40 - 45 1/2 mi. 1/4 mi. 1/2 mi. <br />< 40 1/8 mi. 300 - 660 feet(3) 1/4 mi. <br />Arterial Expressway 50 - 55 1 mi. 1/2 mi. 1 mi. <br />Minor Arterial 50 - 55 1/2 mi. 1/4 mi. 1/2 mi. <br />40 - 45 1/4 mi. 1/8 mi. 1/4 mi. <br /><40 1/8 mi. 300 - 660 feet(i) 1/4 mi. <br />Collector and Local 50 - 55 1/2 mi. 1/4 mi. 1/2 mi. <br />40 - 45 1/8 mi. N/A 1/4 mi. <br /><40 1/8 mi. 300 - 660 feet(s) 1/8 mi. <br />Private Access (I) <br />Subject to conditions for all <br />roadway types and speeds <br />Specific Access Plan By adopted plan/agreement/covenant on land <br />(1) Private access refers to residential, commercial, industrial and institutional driveways. Reference Anoka County's Development <br />Review Manual for specifics on private access. <br />(2) Conditional secondary access is defined as right-inlout. <br />(3) Access spacing may be determined by planning documents approved by the county (e.g., Lino Lakes I-35E AUAR) <br />(4) Any spacing deviations shall have a detailed traffic study completed by the requesting agency, AND approved by the County <br />Engineer. <br />I:1Eng\Standards1Approved Anoka County Access Guidelines 080210.Docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.