My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 06/13/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:38:16 PM
Creation date
9/26/2003 11:23:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />Engineering 10% <br />Staldng and Inspection 7% <br />Fiscal nd Legal 3% <br />Admin~swafion 5% <br />Contingencies 5% <br /> <br />Since the City entered~into an agreement to relocate the roadway, it is proposed that the Ci. ty would <br />finance this cost. Th[us, the assessable project cost would be reduced by $5,840 from the total <br />project cost. <br /> <br />TABLE 1 <br /> <br />ESTIMATED PROJECT COSTS <br /> <br />450 tons @ $26/ton <br />1000 tons @ $6/ton <br />Lump Sum <br />Lump Sum <br />3 ea @ $400/ea <br />2.5 acres @ $1,000/acre <br /> <br />Bituminous Paving $11,700 <br />Class V Base Course 6,000 <br />Regrade Roadway* 4,500 <br />Fine Grade/Test Roll 1,500 <br />Culvert 1,200 <br />Tuff Restoration~ 2.500 <br />Estimated Constrt etlon Cost $27,400 <br />Overhead Costs @ 3£% Construction Cost $,220 <br />Total Project Cost[ $35,620 <br />Project AssessablO Cost $29,770 <br />*City Cost for Relocating the Roadway $ 5,850 <br /> <br />PROJECT FINANCING <br /> <br />It is proposed that t~he project assessable costs be divided equally among.the six benefitted <br />properties. Thus, ea0h parcel identified in Exhibit A would be responsible for $4,962. The City <br />had agreed to accept p.n amount of $9,430 from the developer of Dellwood Hills as full payment <br />for the paving of Bison Street for the benefit to parcels two and three. It is therefore proposed that <br />the City would contribute the difference of $494 between the amount escrowed and the amount due <br />for these two parcels.~ <br />If the project should ~roceed to the stage where the City Council authorizes plans to be prepared <br />and bids to be solicit,~d as required by law, the City Council may award the construction to the <br />lowest responsible l~idder, providing that bid does not exceed 110% of the construction cost <br />estimates contained Herein. After the project has been completed and final costs are known, the <br />public hearing will be held which will identify the actual costs to be recovered by special <br />assessment. Each property may, at any time prior to certification of the assessment to the County <br />Auditor, pay the whdle of the assessment on such property, with interest, except that no interest <br />shall be charged if th~ entire assessment is paid within thirty (30) days from the adoption of the <br />resolution. Special alsessments reported to Anoka County shall be payable over a ten-year period <br />with interest at a rate of 2% above prime rate at the time of the special assessment hearing. This <br />rate is estimated to b 11%. The costs presented in this report are estimates. Table 2 presents a <br />project financing sum mary as it would affect individual properties. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.