I <br />i <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />Storm Sewer <br /> <br />The project ar~ea is presently served by a storm sewer located at the intersection of <br />Xkimo Street NW and 143rd Avenue NW. It is proposed that an 18 inch storm sewer <br />be extended to~, serve the intersection of 143rd Lane NW and Xkimo Street NW. An <br />additional inlet ~or storm water will be placed between la~3rd Lane and 143rd Avenue <br />NW. The proposed storm sewer improvements are shown on Exhibit B. <br /> <br />Street Improvements <br /> <br />Xkimo Court NW and 143rd Lane NW are proposed to be constrUcted as standard <br />seven ton design residential streets, 30 feet in width having surmountable concrete <br />curb and gutter and bituminous pavement. The bituminous pavement shall be a <br />minimum of two inches thick with four inches of Class V base. Xkimo Street NW <br />lying north of iZ~3rd Avenue NW shall consist of a 42 foot wide street with B-6/12 <br />curb along both sides of the street. The pavement shall be constructed with four <br />inches of bituminous and four inches of Class V base sufficient to maintain a nine-ton <br />road design standard. Due to the proposed commercial development on west side of <br />Xkimo. Street, ~a five foot wide concrete sidewalk be placed along the ~west side of <br />Xkimo Street NW. Xkimo Street NW will be improved to the T.H. 47 right of way. <br />A total of four Street lights will be placed along ×kimo Street NW and the cul-de-sacs. <br />Following comp!etlon of the aforementioned street improvements, the boulevard areas <br />behind the curbiwill be covered with a minimum of four inches of black dirt, seeded, <br />fertilized and mulched to establish turf. The proposed street and sidewalk <br />improvements ~,re shown on Exhibit B. <br /> <br />PROJECT COST <br /> <br />A detailed estimate of construction costs are presented in Appendix A. In addition <br />to the construcUon costs, overhead costs include engineering, construction staking <br />and inspection, iegal, administration, interest during construction and contingencies. <br />The overhead !costs for the project are estimated based upon percentages of <br />construction co~t. Those percentages are estimated to be as follows: <br /> <br />Engineering 9% <br />St~king and Inspection 7% <br />Bonding and Legal 3% <br />city Staff Administration 5% <br />Cofltingencies 4% <br />Interest during construction 2% <br /> <br />Table 1 containsla summary of total project costs which have been divided between <br />construction and overhead costs and also categorized between direct costs <br /> <br />2 <br /> <br /> <br />