Laserfiche WebLink
cost of the itefns prior to recording of the final Plat. The DEVELOPER shall also deposit <br />' an amount th4t is determined by the CITY to be adequate to aid in the operation and <br />maintenance 6f street lights in locations determined by the City Engineer and installed by <br />' Anoka Elect4 Cooperative for the first three (3) years. The CITY will bill residents in the <br />Plat at least uarterly for street light maintenance and operation costs; billings will be <br />' initiated at th , time of connection to municipal water and sanitary sewer. The cost of these <br />items is: 1 <br />Topographies ($15.00 per acre) $97.50 <br />TOTAL $97.50 <br />' III. <br />PERMITS, OCCUPANCY AND PROPERTY VALUES: <br />13. Reguiremen� for Building Permits. No building permit for any lot in the Plat shall <br />be issued until: (a) any additional expense incurred in giving final plat approval have been <br />' reimbursed to I he CITY; (c) a Certificate of Survey, including that information required by <br />the CITY, his been supplied to the City Building Official; and (d) all the financial <br />guarantees required by the CITY have been satisfied. <br />IV. <br />' PARK DEDICATION: <br />14. Cash Contri4ution, The Plat is in the Sunfish Lake Park Distract. Park dedication shall <br />' be based on affair market value of $2.50 a square foot and shall be satisfied with a cash <br />payment in tie amount of Thirty Four Thousand Dollars ($34,303.00) (6.5 acres x <br />' $2.50 /square moot x 5 %). <br />V. <br />GENERAL: <br />15. CQnstructi Ite M The DEVELOPER shall adhere to all City <br />' ordinances r lating to, but not limited to, dumping of garbage, site development, <br />construction debris, open burning, etc. <br />' 16. Plat Approv l Expenses. The DEVELOPER agrees that it will pay to the CITY all <br />CITY expens�s incurred in the approval of the Plat, including, but not limited to <br />' administration expenses, engineering and legal fees. Said expenses shall be paid within <br />F <br />