My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 07/25/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:45:08 PM
Creation date
9/26/2003 12:07:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUC' ?ION <br /> <br />The City will be entering into an agreement with James D. and Pamela S. Deal for the <br />development c f an Industrial Park located between the Burlington Northern Railroad and <br />Trunk Highway gl0, approximately one-quarter mile west of County Road g57. The <br />owners have r(~luested the sewer and water be extended to service the industrial park. This <br />report is inten :fled· to examine the feasibility of this sewer and water extension and determine <br />the estimated dosts and assessments for these utilities. <br /> <br />I)i~SCRIPTION OF EXISTING CONDITIONS <br />The parcel proposed for the improvement is located approximately one-quarter mile west of <br />the intersectiog of Highway gl0 with County Road g57. Sanitary sewer will be available <br />immediately nd}rth of the railroad tracks which border the north property line of the property <br />as a result of ~ City project to extend sewer and water to the Anoka Electric Cooperative <br />facility. Water~nain is available at the intersection of Highway gl0 and County Road g57. <br /> <br />DESCRIPTION OF IMPROVEMENTS <br /> <br />It is proposed that sanitary sewer be extended to the property by jacking a ten-inch sanitary <br />sewer beneath Ithe tracks of the Burlington Northern Railroad. Once the sanitary sewer is <br />brought to thei property, it will be extended eastward and westward along an easement <br />running alongithe northern property line to the eastern and western boundaries of the <br />property. The ~epth of the sewer will be held deep enough such that gravity sewer service <br />can be extenddd to serve the properties between County Road g56 and County Road g57 <br />from this sew&. An eight-inch watermain will be extended from the existing watermain <br />located on the !northwest corner of County Road g57 and Highway g10. This watermain <br />will be installdgl with the fight-of-way of Highway gl0 and will be extended past the Oak <br />Terrace Estates Trailer Park and the Ed Hamilton residence to the subject property. <br />Watermain wil~ be extended through the length of the subject property within the drainage <br />and utility easement along the northern right-of-way of Highway gl0. Turf and drive <br />entrances along Highway #10 will be restored. Turf in the areas east at the subject property <br />will be restorc~l with a minimum of four inches of topsoil, fertilizer and seed. The subject <br />property will b~ restored with four inches of topsoil, seed and mulch. Drive entrances will <br />be restored in-kind. <br /> <br />ESTIMATEIi PRO.IECT COST <br /> <br />The estimated ~:onstruction and project costs are summarized in Table 1. Detailed estimates <br />are included inl Appendix B. It is proposed that the jacking of the sanitary sewer beneath <br />the railroad tra{ks and the extension of the watermain from County Road g57 to the eastern <br />property line of the subject property will be considered trunk charges to be financed from <br />the sewer and !water trunk funds. Table 1 also indicates overhead costs at 30% of the <br />construction c~sts as an allowance for engineering, legal, and other indirect costs. The <br />allowance is cbmprised of the following components with the final cost of these items <br />determined by actual costs: <br /> <br />Engineering 10% <br />Btaking and Inspection 7% <br />Fiscal and Legal 3% <br />~dministration 5% <br />Contingencies 5% <br />Total 30% <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.