Laserfiche WebLink
Item <br /> <br /> APPENDIX B <br /> IMPROVEMENT PROJECT g95-19 <br />DETAILED CONSTRUCTION COST ESTIMATES <br /> <br />Unit Price <br /> <br /> I.P.#95-19 <br />~ Attributlable <br /> <br />Sanitary Sewer <br /> <br />18 Street casing auger & jack <br />10" PVC in carrier pipe <br />10" PVC <br />48" Dia Manhole <br />EXcess depth manhole <br />6'I PVC service pipe <br />6'!x10" PVC wye <br />10" PVC plug <br /> Subtotal <br /> <br />$119/lf 145 If -- <br />36.52/lf 190 If -- <br />38.12/lf 1,074 If $40,940.88 <br />1,295/ea 3 ea 3,885.00 <br />68.40/ft 7.5 ft 513.00 <br />14.60/ft 90 ft 1,314.00 <br />74/ea 3 ea 222.00 <br />48/ea 2 ea 96.00 <br /> $46,970.88 <br /> <br />Trunk Cost <br /> <br />$17,255.00 <br /> 6,938.80 <br /> <br />$24,t93.80 <br /> <br />Fern <br /> <br />Watermain <br /> <br />6? DIP Watermain <br />8?DIP <br />81' G.V. w/box <br />6, G.V. w/box <br />Std hydrant <br />2? copper service <br />2? curb stop box <br />2? coup stop <br />Turf establishment w/seed <br />Tuff establishment w/sod <br /> <br /> I.P.#95-19 <br />Quantity Attributable <br /> <br />16.03/ea 70 If 480.90 <br />25.15 2,860 43,761.00 <br />496/ea 1 -- <br />360/ea 7 1,080.00 <br />1,210/ea 7 3,630.00 <br />17.75/ft 30 ft 532.50 <br />176/ea 3 ea 528.00 <br />144/ea 3 ea 432.00 <br />545/acre 1.6 acre 872.00 <br />1.45/sq yd 4,250 sq yd -- <br /> 51,316.40 <br /> <br />Trunk Cost <br /> <br />641.20 <br />28,168.00 <br />496.00 <br />1,440.00 <br />4,840.00 <br /> <br />6,162.50 <br />41,747.70 <br /> <br /> <br />