Laserfiche WebLink
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CASE <br /> <br /> UPD~kTE ON NEW POLICE FACILITY <br />By: Ryan R. Schroeder, City Administrator <br /> <br />Backgroundl <br /> <br />At the June 27g 1995 meeting, Council revisited the issue of Police Department space. At <br />that time, it w~Is noted that we had received an estimate for a 9,750 square foot building of <br />which half wa~ unfinished space. The cost of this building is projected at $450,000, plus <br />site work. Atlthis time, we are uncertain of the site cost in that it will include a utility <br />extension intoiCity property. The extent of the extension is not known. It was noted on <br />June 27 that tl~e space needs study estimate for site work was $60,000. This number did <br />not include a utility extension. <br />On June 27, ~e Council authorized proceeding with new construction. Council was <br />informed that the Police Department would be touring various similar facilities after which <br />they would de4ide upon a conceptual drawing. That has been completed, with the building <br />growing to 5,~,92 square feet on each of two floors (10,184 s.f. total). I am told they <br />envisioned the!building just east of City Hall with a south facing entrance. In a discussion <br />with Sergeant Gustafson, I suggested a north front door in order to utilize the 153rd drive <br />entrance for p~blic access. Sergeant Gustafson did not have a problem with that and so <br />Cory Tauer has reoriented the building. Attached is the Police Department concept as well <br />as the' north faj:ing concept. Slight modifications in the design have occurred due to the <br />amended orier~tation. The concept allows for six garage bays facing west toward the fire <br />apparatus doo~. It is expected that a draft site plan will be available at the table. <br /> <br />The draft budget document proposes an annual lease or mortgage payment of $61,112 (20 <br />years, 8%, $60D,000). It is expected that the enlarged project will experience the following <br /> <br />costs: <br /> <br />,Construction <br />{Professional services <br />!Site work <br />{Furnishing/move <br />!Contingency <br /> <br />$490,000 <br /> 10,000- <br /> 60,000 <br /> 30,000 <br /> 10,000 <br />$600,000 <br /> <br />Council should note that the utility extension is not included in these numbers. <br /> <br />The Council cqn utilize architectural services for design and or construction management. <br />It is expected t}~at this would increase the budget perhaps by $50,000. <br />The Council cgn also bid this project as a design/build project. The City Attorney has <br />concerns that We need to ensure that all bidders through this process would be assured <br />equal opportunity to gain the award. Bidding off concept drawings may not provide <br />comfort that th~tt has been assured. <br /> <br />Council can also initiate a lease/purchase project. The attorney may have the same <br />concerns. <br /> <br /> <br />