My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/12/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 09/12/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:47:08 PM
Creation date
9/26/2003 1:48:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/12/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I' <br />I <br />I <br />I <br />I <br />I <br /> <br /> CASE # 4 <br />INFORMATION ITEM: MODIFICATION TO STRUCTURE DESIGN FOR <br />AI~TCHOR'S AWAY FACILITY; CASE OF JEFFREY DEAL <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: ~ <br /> <br />On May 23, 1995, City Council granted site plan approval to the Anchor's Away facility to be <br />developed on I.,qts 2 and 3 of Deal Industrial Park. Lot 2 was to be developed in 1995 as Phase 1 <br />and Lot 3 was to be developed in 1996 as Phase 2. The approved facility on Lot 2 consisted of a <br />28,000 square fdot structure to be finished in wood siding. <br /> <br />Observations: <br /> <br />Subsequent to the site plan approval, the Applicant has made some design modifications to the <br />building on Lot i2 and the overall size of the facility has decreased from 28,000 square feet to <br />17,752 square f~t. In order to meet building code regulations for a fh'e wail between the boat <br />storage area and! the other services offered on the site, the south wall of the storage area will be <br />constructed of c~ncrete block. The wash, lube, detail and retail portions of the facility will also be <br />constructed of ~oncrete block. Due to time constraints and the pending winter season, the <br />Applicant is prqposing that the development of Lot 2 may have to occur in two phases: boat <br />storage in 1995 _and service center in 1996. This schedule may push out development of Lot 3 to <br />1997 as Phase 3~ <br /> <br />The following i~ms are enclosed: <br /> a) S~te location map <br /> b) Approved site plan and building elevations <br /> c) Modified site plan <br /> d) Modified building elevations for Phase 1' <br /> <br />*Modified buildihg elevations for Phase 2 are pending. <br />Notification: <br /> <br />The property is bordered on both sides by other lots in Deal Industrial Park and no notification of <br />design modifications to neighboring property owners was determined to be neCessary. <br /> <br />Recommendatt,'on: <br /> <br />City Staff recommends approval of the modified building design and phasing schedule. <br /> <br /> Council, Action: <br /> <br /> Motion to; <br /> Approve/~leny the proposed modification to the phasing plan and the building design for <br /> Anchor's ~way in Deal Industrial Park. <br /> <br />Review Checklist: <br /> <br />City Administrator <br />City Engineer <br /> <br />CC: <br /> <br />9/12/95 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.