Laserfiche WebLink
CITY OF RAMSEY <br />CHANGE ORDER NO. 1 <br /> <br />PROJECT: <br /> <br />PROJECT NO: <br /> <br />DATE: <br /> <br />CONTRACTOR: <br /> <br />RAMSEY ELEMENTARY SCHOOL A/~EA TRUNK SANIT~Y SEWER <br />95-13 <br /> <br />September 21, 1995 <br /> <br />Barbarossa & Sons <br /> <br />DESCRIPTION OF CONTRACT REVISION: <br /> <br />The construction of street, storm sewer and sanitary sewer in 151st Avenue, <br />THE HAUBRICH ADDITION, Improvement Project No. 95-14, is added to the scope <br />of constructionlfor the trunk construction project. Watermain construction <br />in 151st Avenueiis already a part of the construction included in the trunk <br />project, makingiit efficient for the sa~e contractor to install the remaining <br />underground utilities and restore the street. <br /> <br />The contract quantities and amount are therefore increased as follows: <br /> <br /> Quantity unit <br />Item unit Change Price ~nount <br /> <br /> BID $C~D[~ D -- S--it~y Sewer, Baubrich (95-14) <br />1 Mobilization L8 1.00 <br />2 Connect To Existing LS 1.00 <br />3 8" PVC, SDR 35, 0' to 10' Deep LF 187.00 <br />4 8" PUC, $DR 35, 10' to 12' Deep LF 241.00 <br />5 0" PVC, SDR 35t 12'i to 14' Deep LF 228.90 <br />6 8" PVC, SDR 35, 14'r to 16' Deep LF 90.00 <br />7 0" PVCt SDR 35, 166 to 18' Deep LF 94.00 <br />8 8" PVC, SDR 35, 18'I to 20' Deep LF 94.00 <br />9 8" PVC, SDR 35, 20'~ to 22' Rep LF 94.00 <br />10 0' PVC, SDR 35~ 22'i to 24' Rep LF 25.00 <br />11 Standard Manhole, ~' to 10' Deep, 40" Dia. EA 4.00 <br />12 Extra Depth Manhole I~ 12.20 <br />13 8" x 4" Wye . EA 21.00 <br />14 4" pvC, SDR 35, S.~ice Pipe ~ 720.00 <br />15 60.00 <br />16 <br /> <br />Crushed Rock Pipe ~dding TON <br />Pipe subgrade Correction <br />TOTAL BIDS~UI~ !D - Sanit~-FS~w~r, Huurbi~h (95-14) <br /> <br />~" Se~ice Conne~tion ~A 2~.00 <br />1' Copper Service ~ LF 800.00 <br />~ BID S~D~ 'B - Wat~-{-, Sa~b~h (9~14) <br /> <br />BID SC~D~ F - ~ S~, Sa~i~B (95-14) <br />15' RCP~ Cla~s 5 ~ 234.00 <br />15' R.C. Apron ~ 1.00 <br />Catchbasin, 27" Dia. ~ 1.00 <br />M~hole, 48" Din. BA 2.00 <br />Rip Rap C~ 4.00 <br />Gsotsxtlle F~ric (~T T~e III) SX 4.00 <br />~ DID ~C~ F - S~ S~, Ha~b (95-14) <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br /> <br />2105.501 <br />2104.505 <br />2104.505 <br />2130.501 <br />2211.503 <br />2331 525 <br />2301 501 <br />2506 522 <br />2506 522 <br />2531 501 <br />0575 501 <br />~DID ~ff-Ji~DULH <br /> <br />Common ExCavation C¥ 1,175.00 <br />Remove Bituminous Pavement S¥ 4,250.00 <br />Remove Co~erete Driveway S¥ 84.00 <br />Water M ~AL 20.00 <br />Aggregate~ Bas~ Placed, Class 5 TON 800.00 <br />· lrpe 41 W~AS0055¥ wear Course Mixture TON 420.00 <br />4' Concre%e Driveway S~ 84.00 <br />Adjust Fr~e & Ring Casting EA 7.00 <br />Adjust Valve Box EA 2.00 <br />Co~crete Curb & Gutter, Type Mount&hie LF 2,450.00 <br />Seeding i AC 0,80 <br /> ~ - Streets, Baubrich (95-14) <br /> <br />TOT~LADDITION&~ <br /> <br />Page 1 of 2 <br /> <br />$5,500.00 $5~500.00 <br />350.00 350.00 <br />22.50 4,207.50 <br />23.00 5,543.00 <br />23.50 5,358.00 <br />24.00 2,160.00 <br />24.50 2,303.00 <br />25.00 2,350.00 <br />25.50 2,397.00 <br />26.00 650.00 <br />1,150.00 4,600.00 <br />75.00 915.00 <br />35.00 735.00 <br />4.7~ 3,420.00 <br />14.00 840.00 <br />8.50 170.00 <br /> $41,498.50 <br /> <br />$ 85.00 $ 1,870.00 <br />6.00 4,800.00 <br /> $ 6,670.00 <br /> <br />19.00 $4,446.00 <br />580.00 580.00 <br />800.00 800.00 <br />1,200.00 2,400.00 <br />50.00 200.00 <br />10.00 40.00 <br /> $B,466.00 <br /> <br />3.50 $ 4,112.50 <br />1.60 6,800.00 <br />2.40 201.60 <br />10.00 200.00 <br />6.85 5,480.00 <br />25.75 10,815.00 <br />2.40 201.60 <br />120.00 840.00 <br />110.00 220.00 <br />6.50 15,925.00 <br />1,O00.O0 OOO.O0 <br /> $45,595.7U <br /> <br /> $102,230.20 <br /> <br /> <br />