CITY OF RAMSEY
<br />CHANGE ORDER NO. 1
<br />
<br />PROJECT:
<br />
<br />PROJECT NO:
<br />
<br />DATE:
<br />
<br />CONTRACTOR:
<br />
<br />RAMSEY ELEMENTARY SCHOOL A/~EA TRUNK SANIT~Y SEWER
<br />95-13
<br />
<br />September 21, 1995
<br />
<br />Barbarossa & Sons
<br />
<br />DESCRIPTION OF CONTRACT REVISION:
<br />
<br />The construction of street, storm sewer and sanitary sewer in 151st Avenue,
<br />THE HAUBRICH ADDITION, Improvement Project No. 95-14, is added to the scope
<br />of constructionlfor the trunk construction project. Watermain construction
<br />in 151st Avenueiis already a part of the construction included in the trunk
<br />project, makingiit efficient for the sa~e contractor to install the remaining
<br />underground utilities and restore the street.
<br />
<br />The contract quantities and amount are therefore increased as follows:
<br />
<br /> Quantity unit
<br />Item unit Change Price ~nount
<br />
<br /> BID $C~D[~ D -- S--it~y Sewer, Baubrich (95-14)
<br />1 Mobilization L8 1.00
<br />2 Connect To Existing LS 1.00
<br />3 8" PVC, SDR 35, 0' to 10' Deep LF 187.00
<br />4 8" PUC, $DR 35, 10' to 12' Deep LF 241.00
<br />5 0" PVC, SDR 35t 12'i to 14' Deep LF 228.90
<br />6 8" PVC, SDR 35, 14'r to 16' Deep LF 90.00
<br />7 0" PVCt SDR 35, 166 to 18' Deep LF 94.00
<br />8 8" PVC, SDR 35, 18'I to 20' Deep LF 94.00
<br />9 8" PVC, SDR 35, 20'~ to 22' Rep LF 94.00
<br />10 0' PVC, SDR 35~ 22'i to 24' Rep LF 25.00
<br />11 Standard Manhole, ~' to 10' Deep, 40" Dia. EA 4.00
<br />12 Extra Depth Manhole I~ 12.20
<br />13 8" x 4" Wye . EA 21.00
<br />14 4" pvC, SDR 35, S.~ice Pipe ~ 720.00
<br />15 60.00
<br />16
<br />
<br />Crushed Rock Pipe ~dding TON
<br />Pipe subgrade Correction
<br />TOTAL BIDS~UI~ !D - Sanit~-FS~w~r, Huurbi~h (95-14)
<br />
<br />~" Se~ice Conne~tion ~A 2~.00
<br />1' Copper Service ~ LF 800.00
<br />~ BID S~D~ 'B - Wat~-{-, Sa~b~h (9~14)
<br />
<br />BID SC~D~ F - ~ S~, Sa~i~B (95-14)
<br />15' RCP~ Cla~s 5 ~ 234.00
<br />15' R.C. Apron ~ 1.00
<br />Catchbasin, 27" Dia. ~ 1.00
<br />M~hole, 48" Din. BA 2.00
<br />Rip Rap C~ 4.00
<br />Gsotsxtlle F~ric (~T T~e III) SX 4.00
<br />~ DID ~C~ F - S~ S~, Ha~b (95-14)
<br />
<br />1
<br />2
<br />3
<br />4
<br />5
<br />6
<br />7
<br />8
<br />9
<br />10
<br />11
<br />
<br />2105.501
<br />2104.505
<br />2104.505
<br />2130.501
<br />2211.503
<br />2331 525
<br />2301 501
<br />2506 522
<br />2506 522
<br />2531 501
<br />0575 501
<br />~DID ~ff-Ji~DULH
<br />
<br />Common ExCavation C¥ 1,175.00
<br />Remove Bituminous Pavement S¥ 4,250.00
<br />Remove Co~erete Driveway S¥ 84.00
<br />Water M ~AL 20.00
<br />Aggregate~ Bas~ Placed, Class 5 TON 800.00
<br />· lrpe 41 W~AS0055¥ wear Course Mixture TON 420.00
<br />4' Concre%e Driveway S~ 84.00
<br />Adjust Fr~e & Ring Casting EA 7.00
<br />Adjust Valve Box EA 2.00
<br />Co~crete Curb & Gutter, Type Mount&hie LF 2,450.00
<br />Seeding i AC 0,80
<br /> ~ - Streets, Baubrich (95-14)
<br />
<br />TOT~LADDITION&~
<br />
<br />Page 1 of 2
<br />
<br />$5,500.00 $5~500.00
<br />350.00 350.00
<br />22.50 4,207.50
<br />23.00 5,543.00
<br />23.50 5,358.00
<br />24.00 2,160.00
<br />24.50 2,303.00
<br />25.00 2,350.00
<br />25.50 2,397.00
<br />26.00 650.00
<br />1,150.00 4,600.00
<br />75.00 915.00
<br />35.00 735.00
<br />4.7~ 3,420.00
<br />14.00 840.00
<br />8.50 170.00
<br /> $41,498.50
<br />
<br />$ 85.00 $ 1,870.00
<br />6.00 4,800.00
<br /> $ 6,670.00
<br />
<br />19.00 $4,446.00
<br />580.00 580.00
<br />800.00 800.00
<br />1,200.00 2,400.00
<br />50.00 200.00
<br />10.00 40.00
<br /> $B,466.00
<br />
<br />3.50 $ 4,112.50
<br />1.60 6,800.00
<br />2.40 201.60
<br />10.00 200.00
<br />6.85 5,480.00
<br />25.75 10,815.00
<br />2.40 201.60
<br />120.00 840.00
<br />110.00 220.00
<br />6.50 15,925.00
<br />1,O00.O0 OOO.O0
<br /> $45,595.7U
<br />
<br /> $102,230.20