Laserfiche WebLink
U~/ZZ/~o lo;IU l'A& OIX ~1 oOOo JUlh~ ULI~R AbbU ~UUX <br /> <br />CITY OF RAMSEY <br />CHA~GE ORDER NO. 1 <br /> <br />PROJECT: RAMSEY ELEMENTARY <br /> <br />PROJECT NO: 95-13 <br /> <br />SCHOOL AREA TRUNK S~tNITARY SEWER <br /> <br />DATE: September 21, 1995 <br /> <br />CONTRACTOR: <br /> <br />Barbarossa & Sons <br /> <br />DESCRIPTION OF CONTRACT REVISION: <br /> <br />The construction of street, storm sewer and sanitary sewer in 151st Avenue, <br />THE HAUBRICH ADDITION, Improvement Project No. 95-14, is added to the scope <br />of constructionlfor the trunk construction project. Watermain construction <br />in 151st Avenue,is already a part of the construction included in the trunk <br />project, making it efficient for the same contractor to install the remaining <br />underground utilities and restore the street. <br /> <br />The contract quantities and amount are therefore increased as follows: <br /> <br /> Quantity unit <br />Item Unit Change Price Amount <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br /> <br />B~D BC-~DUL~ D -- S~lt~rF Sewer, Baubrich (95-14) <br />Mobilization <br />Connect To Existing. <br />8" PVC, SDR 35, O' ~o 10' Deep <br />8" PVC, SDR 35, 10' to 12 Deep <br />8" PVC, SDR 35, 12' to 14 Deep <br />8" PVC, SDR 35, 14' to 16 Deep <br />0" PVC, SDR 35, 16' to 18 Deep <br />8" PVC, $DR 35~ 18' to 20 Deep <br />8" ~VC, SDR 35, 20' tO <br />8' PVC, SDR 35, 22'~to 24 Deep <br />Standard Manhole, 0' to 10' Deep, 40" Dia. <br />Extra Depth Manhole <br />8' x 4" Wye <br />4" PVC, SDR 35~ S~rvice Pipe <br />Crushed Rock Pipe Bedding <br />Pipe Subgrade Correction <br /> <br />LS 1.00 $5,500.00 <br />LS 1.00 350.00 <br />LF 187.00 22.50 <br />LF 241.00 23.00 <br />LF 228.00 23.50 <br />LF 90.00 24.00 <br />LF 94.00 24.50 <br />LF 94.00 25.00 <br />LF 94.00 25.50 <br />LF 25.00 26.00 <br />~A 4.00 1,150.00 <br />LF 12.20 75.00 <br />~% 21.00 35.00 <br />LP 72O.0O 4.7~ <br />TON 60.00 14.00 <br />Cg 20.00 8.50 <br /> <br />D - Sanitary S~r, Haurbich (95-14) <br /> <br />TOTAn ~IDSCII~D~ <br /> <br />BID SCHHBULE E - Waterm"in, Bauhrlch (95-14) <br />1' Service ConnectiOn ~ <br />1' Copper Service Pipe LF <br />~ ~ID ~D~ ~E - Wat~, Ba~b~h (9~14} <br /> <br />BID SC~D~ F - S~ S~, Ba~rich (95-14) <br />15' RCP, Class 5 ~ <br />15' R.C. Apron ~ <br />Catchbaaln, 27" Die, EA <br />M~hole, 48' Dia. EA <br />Rip Rap CY <br />Geotextlle F~ric (~DOT T~e III) SY <br /> <br />2105.501 Co--on Excavation <br /> <br />2104.505 <br />2104.505 <br />2130.501 <br />2211.503 <br />2331.525 <br />2301.501 <br />2506.522 <br />2506.522 <br />2531.501 <br />0575.501 <br /> <br />22.00 <br />800.00 <br /> <br />1 <br />2 <br />3 <br /> <br />6 <br />7 <br />8 <br /> <br />10 <br />11 <br /> <br />234.00 <br /> 1.00 <br /> 1.00 <br /> 2.00 <br /> 4,00 <br /> 4.00 <br /> <br /> CY 1,175.00 <br />Remove Bituminous Pavan~nt S¥ 4,250.00 <br />Remove Cohorete Driveway 8Y 84.00 <br />Water H ~AL 20.00 <br />AggregatelBase Plaoed, Class 5 TON 800.00 <br />Type 41 W~AS0055¥ Wear Course Mixture TON 420.00 <br />4' Concrete Driveway Sg 84.00 <br />Adjust Frame & Ring Casting E~ 7.00 <br />Adjust Valve Box EA 2.00 <br />Concrete Curb & Gutter, Type Mountable LF 2,450.00 <br />Seeding AC 0.B0 <br />SCHEDULE G - Streets, Baubrich (95-14) <br /> <br />~ADOITIO~T. <br /> <br />Page 1 of 2 <br /> <br />$ 85.00 <br /> 6.00 <br /> <br />$ 19.00 <br />580.00 <br />800.00 <br />1,200.00 <br />50.00 <br />10.00 <br /> <br />$ 3.50 <br />1.60 <br />2.40 <br />10.00 <br />6.85 <br />25.75 <br />2.40 <br />120.00 <br />110.00 <br />6.50 <br />1,000.O0 <br /> <br /> $5,500.00 <br /> 350.00 <br /> 4,207.50 <br /> 5,543.00 <br /> 5,358.00 <br /> 2,160.00 <br /> 2,303.00 <br /> 2~350.00 <br /> 2~397.00 <br /> 650 O0 <br /> 4,600 0D <br /> 915 O0 <br /> 735 00 <br /> 3,420 00 <br /> 840 00 <br />170 00 <br /> $41,498.50 <br /> <br />1,870.00 <br />4,800.00 <br />6,670.00 <br /> <br />$4,446.00 <br />580,00 <br />800.00 <br />2,400.00 <br />200.00 <br />40.00 <br />$B,466.00 <br /> <br /> $ 4,112.50 <br /> 6,800.00 <br /> 201.60 <br /> 200.00 <br /> 5,480.00 <br /> 10,BIS.00 <br /> 201.60 <br /> 840.00 <br /> 220.00 <br /> 15,925.00 <br /> 800.00 <br /> $45,595.70 <br /> <br />$102,230.20 <br /> <br /> <br />