Laserfiche WebLink
CITY OF RAMSEY <br />CHANGE ORDER NO. 1 <br /> <br />PROJECT'. <br /> <br />NAMSEY ELEMENTARY SCHOOL AREA TRUNK SANITARY SEWER <br /> <br />PROJECT NO: 95-13 <br /> <br />DATE: <br /> <br />September 21, 1995 <br /> <br />CONTRACTOR: <br /> <br />Barbarossa & Sons <br /> <br />DESCRIPTION OF ~ONTRACT REVISION: <br /> <br />The construction of street, storm sewer and sanitary sewer in 151st Avenue, <br />THE HAUBRICH ADDITION, Improvement Project No. 95-14, is added to the scope <br />of construction ifor the trunk construction project. Watermain construction <br />in 151st Avenue ~zs already a part of the construction included in the trunk <br />project, making it efficient for the same contractor to install the remaining <br />underground utilities and restore the street. <br /> <br />The contract quantities and amount are therefore increased as follows: <br /> <br /> Item Uoit <br /> <br /> BID $C~ P - S~ft~y Se~.r, Baubri=h (95-14) <br />1 Mobilization LS 1.00 $5,500.00 <br />2 Connect ~ Exi6ting i LS 1.00 350.00 <br />3 8' PVC, $DR 35, O' bo 10' Deep LF 187.00 22.50 <br />4 8" PVC, $DR 35, 10' Itc 12' Deep LF 241.00 23.00 <br />5 0" PUC, SDR 35, 12' :~o 14' Deep LF 228.00 23.50 <br />6 8" PVC, SDR 35, 14' Itc 16' Deep LF 90.00 24.00 <br />7 8" P~;C, SDR 35, 16' itc 18' Deep LF 94.00 24.50 <br />0 0" PVC, SDR 35, 10' :to 20' Deep LF 94.00 25.00 <br />9 8" E~C, SDR 35, 20' [tO 22' Deep I~ 94.80 25.50 <br />10 0" pVC, SDR 35, 22' !to 24' Deep LF 25.00 26.00 <br /> <br />11 St~ndmrd Manhole, 0' to 10' Deep, 40" Dia. EA 4.00 <br />12 Extra Depth Manhole' LF 12.20 <br />13 8" X 4" Wye EA 21.00 <br />14 4' PVC, eDR 35, SerVice Pipe LF 720.00 <br />15 Crushed Rock Pipe B~dding TO~ 60.00 <br />16 Pipe eubgrade Corredtion CX 20.00 <br /> T~Y~AL BID S~0~ ~ -- $anit~-F Sewer, Huurbich (95-14) <br /> <br />I ~' Service ConnectiOn E~ 22.00 <br />2 1" Copper Service P~ LF 800,00 <br /> ~ BID S~D~ ~ -- Wat~-{-, Hs~bioh (95-14) <br /> <br /> BID SC~D~ F -- ~m S~, Ba~ri~h (95-14) <br />1 15' RCP, Ck~ 5 LF 234.00 <br />2 1~" R.C. Apron ~ 1.00 <br />3 Catchba6in, 27" Dia. EA 1.00 <br />4 Manhols~ 48' Dia. EA 2.00 <br />5 Rip Rap CY 4.00 <br />6 Geotextlle F~ric (~T T~e III) SY 4.00 <br /> <br /> 2105.501 Co--on ExCavation C~ 1,175.00 <br /> 2104.505 Re,Ye Bi~umin0us Parent SY 4,250.00 <br /> 2104.505 Re--ye ConCrete Driveway SY 84.00 <br /> 2130.501 Water M <br /> 2211.503 Aggregate ~a~ <br /> 2331.525 T~s 41 ~50055Y Wear Course M~ture ~N 420.00 <br /> 2301.501 4" Concret~ Driveway SY 84.00 <br /> 2506.522 Adjust Fr~e & Ring Casting EA 7.00 <br /> 2506.522 Adjust valve Box EA 2.00 <br /> 2531.501 Co~crete Curb A Gutter, T~e Mount~le LF 2,450.00 <br /> AC 0.80 <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 0575.501 Seeding ~ <br /> ~ BID SC~D~ ~ - Streets, ~aubrich (95-14) <br /> <br />Quantity unit <br />Change Price An~unt <br /> <br />1,150.00 <br />75.00 <br />35.00 <br />4.7~ <br />14.00 <br />8.50 <br /> <br />85.00 <br /> 6.00 <br /> <br />19.00 <br />580.00 <br />800.00 <br />1,200.00 <br />50.00 <br />10.00 <br /> <br />3.50 <br />1.60 <br />2.40 <br />10.00 <br />6.85 <br />25.75 <br />2.40 <br />120.00 <br />110.oo <br />6,50 <br />1,000.00 <br /> <br />~TAL~DDITIOEAT. <br /> <br /> $5,500.00 <br /> 350.00 <br /> 4,207.50 <br /> 5,543.00 <br /> 5,350.00 <br /> 2,160.00 <br /> 2,303.00 <br /> 2,350.00 <br /> 2,397.00 <br /> 650.00 <br /> 4,600.00 <br /> 915.00 <br /> 735.00 <br />3,420.00 <br /> 840.00 <br /> 170.00 <br /> $41,498.50 <br /> <br />1,870.00 <br />4,800.00 <br />6,670.00 <br /> <br />$4,446.00 <br />580.00 <br />800.00 <br />2,400.00 <br />200.00 <br />40.00 <br />$8,466.00 <br /> <br /> $ 4,112.50 <br /> 6,800.00 <br /> 201.60 <br /> 200.00 <br /> 5,480.00 <br /> 10,815.00 <br /> 201.60 <br /> 840.00 <br /> 220.00 <br /> 15,925.00 <br /> 800.00 <br /> $45,595.?0 <br /> <br />$102,230.20 <br /> <br />Page 1 of 2 <br /> <br /> <br />