CITY OF RAMSEY
<br />CHANGE ORDER NO. 1
<br />
<br />PROJECT:
<br />
<br />PROJECT NO:
<br />
<br />DATE:
<br />
<br />CONTRACTOR:
<br />
<br />RAMSEY ELEMENTARY SCHOOL D~REA TRUNK SANITARY
<br />
<br />September 21, 1995
<br />
<br />Barbarossa & Sons
<br />
<br />SEWER
<br />
<br />DESCRIPTION OF CONTRACT REVISION:
<br />
<br />The constructiom of street, storm sewer and sanitary sewer in 151st Avenue,
<br />THE HAUBRICH ~HD~ITION, Improvement Project No. 95-14, is added to the scope
<br />of constructionlfor the trunk construction project. Watermain construction
<br />in 151st Avenue.is already a part of the construction included in the trunk
<br />project, making ,it efficient for the same contractor to install the remaining
<br />underground utilities and restore the street.
<br />
<br />The contract quantities and amount are therefore increased as follows:
<br />
<br />1
<br />2
<br />3
<br />4
<br />5
<br />6
<br />7
<br />0
<br />9
<br />10
<br />11
<br />12
<br />13
<br />14
<br />15
<br />16
<br />
<br /> Quantity unit
<br />Item unit Change Price Amount
<br />
<br />B~ SCUED~ D -- S~nitorF Sewer, Baubrich (95-14}
<br />Mobilization
<br />Connect To Existing~
<br />8" PVC, $DR 35~ 0' to 10' Deep
<br />8" PVC, $DR 35, 10' to lZ Deep
<br />8" PVC, SDR 35, 12';to 14 Deep
<br />8" PVC, SDR 35, 14'~to 16 Deep
<br />8" P,;C~ SDR 35~ 16' to 18 D=ep
<br />0" PVC, SDR 35, 18',to 20 Deep
<br />8" ~C, SDR 35, 20' to Z2 Deep
<br />8" PVC, SDR 35, 22' to 24 Deep
<br />St~dard Mauhole, 0' to 10' Deep, 48" Dia.
<br />Extra Depth M~nhole
<br />8" x 4" Wye
<br />4" PVC, SDR 35, smr~ice Pipe
<br />Cru~h,d Rock Pipe Sedding
<br />
<br />LS 1.00 $5,500.00 $5,500.00
<br />LS 1.00 350.00 350.00
<br />LF 187.00 22.50 4,207.50
<br />LF 241.00 23.00 5,543.00
<br />LF 228.00 23.50 5,358.00
<br />LF 90.00 24.00 2,160.00
<br />LF 94.00 24.50 2,303.00
<br />LF 94.00 25.00 2,350.08
<br />LF 94,00 25.50 2,397.00
<br />LF 25.00 26.00 650.00
<br />EA 4.00 1,150.00 4,600.00
<br />LF 12.20 75.00 915.00
<br />~A 21.00 35.00 735.00
<br />~F 720.00 4.75~ 3,420.00
<br />TON 60.00 14.00 840.00
<br /> 20.00 8.50 170.00
<br /> $41,498.50
<br />
<br />Pip~ Subgrede CorreCtion Cg
<br />~RT. ~D SCB~D~ D - SanltarFS~kr, Haurbiuh (95-14~
<br />
<br />1' Service ConnectiOn HA
<br />1' Copper Service P~pe LF
<br />
<br />15' RCP, CIB~S 5 LF
<br />15" R.C. Apron EA
<br />Catchbasin, 27" Din. EA
<br />Munhole~ 48" Dia. EA
<br />Rip Rap CY
<br />Ceotextlle F~ric (~T T~e III) SY
<br />
<br />~ID G~D~ ~ -- S~e~t~, Ha~lch (95-14}
<br />2105.501 Co,on Ex~avation
<br />
<br />1
<br />2 2104.505
<br />3 2104.505
<br />4 2130.501
<br />5 2211.503
<br />6 2331.525
<br />7 2301.501
<br />8 2506.522
<br />9 2506.522
<br />10 2531.501
<br />11 0575.501
<br />
<br />22.00 $ 85.00 $ 1,870.00
<br />800.00 6.00 4,B00.00
<br /> $ 6,670.00
<br />
<br />234.00 $ 19.00 $4,446.00
<br />1.00 580.00 580.00
<br />1.0O 800.00 000.00
<br />2.00 1,200.00 2,400.00
<br />4.00 50.00 200.00
<br />4.00 10.00 40.00
<br /> $8,466.00
<br />
<br /> C~ 1,175.00
<br />Remove Bi~uminous Pavement SY 4,250.00
<br />Remove Co~crete Driveway 8Y 84.00
<br />Water M GA~ 20.00
<br />Aggregetei~ase Placed, Class 5 TON 800.00
<br />Type 41 ~,A50055Y Wear Course Mixture TON 420.00
<br />4' Concrete DriveWay SY 84.00
<br />Adjust Fr~ne & Ring Casting EA 7.00
<br />Adjust Vaiv~ Dox EA 2.00
<br />Concrete Curb & Gutter, Type Mountable LF 2,450.00
<br />seeding AC 0.B0
<br /> 'G - Streets, ~aubrich (95-14)
<br />
<br />$ 3.50 $ 4,112.50
<br />1.60 6,000.00
<br />2.40 201.60
<br />10.00 200.00
<br />6.85 5,480.00
<br />25.75 10,015.00
<br />2.40 201.60
<br />120.00 840.00
<br />110.00 220.00
<br />6.50 15,925.00
<br />1,OOO.O0 800.00
<br /> $45,595.70
<br />
<br /> $102,230.20
<br />
<br />Page 1 of 2
<br />
<br />