Laserfiche WebLink
CITY OF RAMSEY <br />CHANGE ORDER NO. 1 <br /> <br />PROJECT: <br /> <br />PROJECT NO: <br /> <br />DATE: <br /> <br />CONTRACTOR: <br /> <br />RAMSEY ELEMENTARY SCHOOL D~REA TRUNK SANITARY <br /> <br />September 21, 1995 <br /> <br />Barbarossa & Sons <br /> <br />SEWER <br /> <br />DESCRIPTION OF CONTRACT REVISION: <br /> <br />The constructiom of street, storm sewer and sanitary sewer in 151st Avenue, <br />THE HAUBRICH ~HD~ITION, Improvement Project No. 95-14, is added to the scope <br />of constructionlfor the trunk construction project. Watermain construction <br />in 151st Avenue.is already a part of the construction included in the trunk <br />project, making ,it efficient for the same contractor to install the remaining <br />underground utilities and restore the street. <br /> <br />The contract quantities and amount are therefore increased as follows: <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />0 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br /> <br /> Quantity unit <br />Item unit Change Price Amount <br /> <br />B~ SCUED~ D -- S~nitorF Sewer, Baubrich (95-14} <br />Mobilization <br />Connect To Existing~ <br />8" PVC, $DR 35~ 0' to 10' Deep <br />8" PVC, $DR 35, 10' to lZ Deep <br />8" PVC, SDR 35, 12';to 14 Deep <br />8" PVC, SDR 35, 14'~to 16 Deep <br />8" P,;C~ SDR 35~ 16' to 18 D=ep <br />0" PVC, SDR 35, 18',to 20 Deep <br />8" ~C, SDR 35, 20' to Z2 Deep <br />8" PVC, SDR 35, 22' to 24 Deep <br />St~dard Mauhole, 0' to 10' Deep, 48" Dia. <br />Extra Depth M~nhole <br />8" x 4" Wye <br />4" PVC, SDR 35, smr~ice Pipe <br />Cru~h,d Rock Pipe Sedding <br /> <br />LS 1.00 $5,500.00 $5,500.00 <br />LS 1.00 350.00 350.00 <br />LF 187.00 22.50 4,207.50 <br />LF 241.00 23.00 5,543.00 <br />LF 228.00 23.50 5,358.00 <br />LF 90.00 24.00 2,160.00 <br />LF 94.00 24.50 2,303.00 <br />LF 94.00 25.00 2,350.08 <br />LF 94,00 25.50 2,397.00 <br />LF 25.00 26.00 650.00 <br />EA 4.00 1,150.00 4,600.00 <br />LF 12.20 75.00 915.00 <br />~A 21.00 35.00 735.00 <br />~F 720.00 4.75~ 3,420.00 <br />TON 60.00 14.00 840.00 <br /> 20.00 8.50 170.00 <br /> $41,498.50 <br /> <br />Pip~ Subgrede CorreCtion Cg <br />~RT. ~D SCB~D~ D - SanltarFS~kr, Haurbiuh (95-14~ <br /> <br />1' Service ConnectiOn HA <br />1' Copper Service P~pe LF <br /> <br />15' RCP, CIB~S 5 LF <br />15" R.C. Apron EA <br />Catchbasin, 27" Din. EA <br />Munhole~ 48" Dia. EA <br />Rip Rap CY <br />Ceotextlle F~ric (~T T~e III) SY <br /> <br />~ID G~D~ ~ -- S~e~t~, Ha~lch (95-14} <br />2105.501 Co,on Ex~avation <br /> <br />1 <br />2 2104.505 <br />3 2104.505 <br />4 2130.501 <br />5 2211.503 <br />6 2331.525 <br />7 2301.501 <br />8 2506.522 <br />9 2506.522 <br />10 2531.501 <br />11 0575.501 <br /> <br />22.00 $ 85.00 $ 1,870.00 <br />800.00 6.00 4,B00.00 <br /> $ 6,670.00 <br /> <br />234.00 $ 19.00 $4,446.00 <br />1.00 580.00 580.00 <br />1.0O 800.00 000.00 <br />2.00 1,200.00 2,400.00 <br />4.00 50.00 200.00 <br />4.00 10.00 40.00 <br /> $8,466.00 <br /> <br /> C~ 1,175.00 <br />Remove Bi~uminous Pavement SY 4,250.00 <br />Remove Co~crete Driveway 8Y 84.00 <br />Water M GA~ 20.00 <br />Aggregetei~ase Placed, Class 5 TON 800.00 <br />Type 41 ~,A50055Y Wear Course Mixture TON 420.00 <br />4' Concrete DriveWay SY 84.00 <br />Adjust Fr~ne & Ring Casting EA 7.00 <br />Adjust Vaiv~ Dox EA 2.00 <br />Concrete Curb & Gutter, Type Mountable LF 2,450.00 <br />seeding AC 0.B0 <br /> 'G - Streets, ~aubrich (95-14) <br /> <br />$ 3.50 $ 4,112.50 <br />1.60 6,000.00 <br />2.40 201.60 <br />10.00 200.00 <br />6.85 5,480.00 <br />25.75 10,015.00 <br />2.40 201.60 <br />120.00 840.00 <br />110.00 220.00 <br />6.50 15,925.00 <br />1,OOO.O0 800.00 <br /> $45,595.70 <br /> <br /> $102,230.20 <br /> <br />Page 1 of 2 <br /> <br /> <br />