Laserfiche WebLink
U~/ZZ/90 £o:IU t'.%.k biz ~41 ab~0 JUH~ ULZ~hK AbbU ~uu~ <br /> <br />CITY OF RAMSEY <br />CHANGE ORDER NO. 1 <br /> <br />PROJECT: <br /> <br />PROJECT NO: <br /> <br />DATE: <br /> <br />CONTRACTOR: <br /> <br />RAMSEY ELEMENTARY SCHOOL AREA TRUNK <br />95-13 <br />September 21, 1995 <br />Barbarossa & Sons <br /> <br />SANITARY SEWER <br /> <br />DESCRIPTION OF dONTRACT REVISION: <br /> <br />The construction of street, storm sewer and sanitary sewer in 151st Avenue, <br />THE HAUBRICH ADDITION, Improvement Project No. 95-14, is added to the scope <br />of constructionlfor the trunk construction project. Watermain construction <br />in 151st Avenue lis already a part of the construction included in the trunk <br />project, making ~t efficient for the same contractor to install the remaining <br />underground utilities and restore the street. <br /> <br />The contract quantities and amount are therefore increased as follows: <br /> <br /> Quantity Unit <br />Item Unit Cha~ge Price Amount <br /> <br /> BID SCH~OULE D - S~it~ry Sewer, Heubri=h (95-14} <br />I Mobilization ! LB 1.00 $5,500.00 $5,500.80 <br />2 Connect To Existing LS 1.D0 350.00 350.00 <br />3 8" PVC, SDR 35, 0' to 10' Deep LF 187.00 22.50 4,207.50 <br />4 8# PUC, SDR 35, 10' rto 12' Deep LF 241.00 23.00 5,543.00 <br />5 8# PVC, SDR 35, 12'ltd 14' Deep LF 228.00 23.50 5,358.00 <br />6 8" PVC, SDR 35, 14' ito 16' Deep LF 90.00 24.00 2,160.00 <br />7 0" PVC, SDR 35, 16' ~to lB' Deep LF 94.00 24.50 2,303.00 <br />8 0" PVC, SDR 35, 18' ito 20' Deep LF 94.00 25.00 2,350.00 <br />9 8" PVC, SDR 35, 20' !to 22' Deep LF 94.00 25.50 2,397.00 <br />10 8" pvc, BDR 35, 22'!to 24' Deep LF 25.00 26.00 650.00 <br />11 Stand~rd Manhole, O' to 10' Deep, 48" Dia. EA 4.D0 1,150.00 4,600.00 <br />12 Extra Depth M~nhole LF 12.20 75.00 915.00 <br />13 8" x 4" Wye ~ EA 21.00 35.00 735.00 <br />14 4" PvC, SDR 35, Sergice Pipe LF 720.00 4.7~ 3,420.00 <br />15 Crushed Rock Pipe B~dding TON 60.00 14.00 840.00 <br />16 20.00 8.50 170.00 <br /> $41,498.50 <br /> <br />Pipe Subgrade Corre~tion C~ <br />~an ~S~D~ rD -- Sea, tarF B~w~r, Naur~oh (95-14} <br /> <br />1" Sa~ice ConnectiOn EA 22.00 $ 85.00 <br />1" Copper Sorvice Pl~ LF 800.00 6.00 <br />~ ~ID E~D~ r~ - Wat~, Ha~b~h (9~14) <br /> <br />BID SC~D~ F - S~ ~, ~a~ri=h {95-14] <br />15" RCP~ Class 5 ~ 234.00 $ 19.0~ <br />15" R.C. Apron ~ 1.0~ 580.0~ <br />Catchbasin, 27" Dia.~ ~ 1.00 800.00 <br />Manhole~ 48" Din. EA 2.00 1,200.00 <br />Rip Rap CY 4.00 50.00 <br />Geotsxtlle F~ri= (~T T~e III) SY 4.00 1O.00 <br /> <br />1 2105,501 <br />2 2104,505 <br />3 2104,505 <br />4 2130,501 <br />5 2211,503 <br />6 2331,525 <br />7 2301,501 <br />0 2506.522 <br />9 2506.522 <br />10 2531.501 <br />11 0575,501 <br />TO~AL ~ID ~crn~DUl.~ <br /> <br />Common Ex~avation C~ 1,175.00 <br />Remove Bi~uminous Pavement SY 4,250.00 <br />Remove Con~re%e Driveway BY 84.00 <br />Water M GAl., 20.00 <br />Aggregate ~a~e Plaoed, Class 5 TON 800.00 <br />Type 41 WE~50055Y Wear Course Mixture TON 420.00 <br />4" Concret~ Driveway SY 84.0~ <br />Adjust Fr~e & Ring Casting EA 7.0~ <br />Adjust Valve Box EA 2.00 <br />Concrete C~rb & Gutter, Type Mountable LF 2,450.00 <br />Seeding ! AC 0.B0 <br /> ~ - Streets, ~ubrich (95-14) <br /> <br />~T~T~ADDITION&T. <br /> <br />Page 1 of 2 <br /> <br />$ 3,50 <br />1.60 <br />2.40 <br />10,00 <br />6.85 <br />25 75 <br />2 40 <br />120 O0 <br />110 O0 <br />6 50 <br />1,O00 DO <br /> <br />1,870.00 <br />4,000.00 <br />6,670.00 <br /> <br />$4,446.00 <br />580.00 <br />000.00 <br />2,400.00 <br />200.00 <br />40.00 <br />$8,466.00 <br /> <br /> $ 4,112.50 <br /> 6,800.00 <br /> 201.60 <br /> 200.00 <br /> 5,480.00 <br /> 10,815.00 <br /> 201.60 <br /> 840.00 <br /> 220.00 <br /> 15,925.00 <br /> BD0.O0 <br /> $45,595.70 <br /> <br />$102,230.20 <br /> <br /> <br />