Laserfiche WebLink
I <br /> I <br /> I <br /> I <br />;I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />16 <br /> <br />d <br /> <br />Pipe Subgrade Correction <br /> <br />CY <br /> <br />TOTAL BID SCHEDUI, E D - Sanitary Sewer, Haubrich (95-14) <br />BID SCHEDULE E - Watermain, Haubrich (95-14) <br /> <br />20.00 <br /> <br />1 1" Service Connection EA <br />2 1" Copper Service PiPer LF <br /> <br />TOTAL BiD SCHEDULE E- Watermain, Haubdch (95-14) <br /> <br />BiD SCHEDULE F - ..~orm Sewer, Haubrich (95-14) <br /> <br />1 15" RCP, Class 5 LF <br />2 15" R.C. Apron EA <br />3 Catchbasln, 27'' Dia. EA <br />4 Manhole, 48" Dia. EA <br />5 RIp Rap CY <br />6 Geotextile Fabric (MnDOT Type III) SY <br /> <br />TOTAL BID SCHEDULE F- Storm Sewer, Haubrioh (95-14) <br />BID SCHEDULE G - Streets, Haubrich (95-14) <br /> <br />1 2105.501 Common F_x~vation <br />2 2104.505 Remove Bituminous Pavement <br />3 2104.505 Remove coriCrete Driveway <br />4 2130.501 Water : <br /> <br />5 2211.503 Aggregate B~se Placed, Class 5 <br />6 2331.525 Type 41 WE~50055Y Wear <br /> Course Mixture <br />7 2301.501 4" Concrete .Driveway SY <br />8 2506.522 Adjust Frame & Ring Casting EA <br />9 2506.522 Adjust Valve~Box EA <br />10 2531.501 Conc. Curb ~1, Gutter, Type MountableLF <br />11 0575.501 Seeding AC <br /> <br />234.00 <br /> <br /> 1.00 <br /> <br /> 1.00 <br /> <br /> 2.00 <br /> <br /> 4.00 <br /> <br /> 4.00 <br /> <br />CY <br />SY <br />SY <br /> <br />M GAL <br />TON <br />TON <br /> <br />TOTAL BID SCHEDULE G - Streets, Haubrlch (95-14) <br /> <br />1,175.00 <br />4,250.00 <br />84.00 <br />20.00 <br />800.00 <br />420.00 <br /> <br /> 84.00 <br /> 7.00 <br /> <br /> 2.00 <br />2,450.00 <br /> 0.80 <br /> <br />BID SUMMARY <br /> <br />a TOTAL BID SCHEDULE A - Sanitary Sewer <br />b TOTAL BID SCHEDULE B -Watermaln <br />c TOTAL BID SCHEDUL~ C - Sitework And Streets <br />d TOTAL BID SCHEDULE D- Sanitary Sewer, Haubdch (95-14) <br />e TOTAL BID SCHEDULE E -Watermaln, Haubdch (95-14) <br />f TOTAL BID SCHEDULE F - Storm Sewer, Haubdch (95-14) <br />g TOTAL BID SCHEDULE G - Streets, Haubdch (95-14) <br /> <br />t TOTAL <br /> <br />Page Go[ 6 <br /> <br />8.50 <br /> <br />85.00 <br /> <br /> 6.00 <br /> <br />19.00 <br />500.00 <br />800.00 <br />1,200.00 <br />50.00 <br />10.00 <br /> <br /> 3.50 <br /> <br /> 1.60 <br /> 2.40 <br /> <br />10.00 <br /> 6.85 <br /> <br />25.75 <br /> <br /> 2.40 <br /> 120.00 <br /> 110.00 <br /> 6.50 <br />1,000.00 <br /> <br />0.00 <br /> <br /> 15.00 <br /> <br />650.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br /> 0.00 <br />4,250.00 <br /> 0.00 <br /> 0.00 <br /> 0.00 <br /> 0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br />0.00 <br />0.00 <br /> <br /> 0.00 <br />39,478.50 <br /> <br />1,276.00 <br />3,300.00 <br /> <br />4,675.00 <br /> <br />0,00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br /> 0.00 <br />6,800.00 <br /> 0.00 <br /> 0.00 <br /> 0,00 <br /> 0.00 <br /> <br />0.00 <br /> <br />0.00 <br /> <br />0.00 <br />0.00 <br />0.00 <br /> <br />6,800.00 <br /> <br />285,435.50 <br />134,879.00 <br />23~33.00 <br />39,478.60 <br />4,675.00 <br />0.00 <br />G,800.O0 <br /> <br />495,101.00 <br /> <br /> <br />