My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/28/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 11/28/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:49:46 PM
Creation date
9/26/2003 3:19:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/28/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br />CHA1~ <br /> <br />Background: <br /> <br />There was a minor ¢ <br />Addition. The origh <br />to the River's Bend <br />the excavation and <br /> <br /> CASE # <br />IGE ORDER FOR IMPROVEMENT PROJECT 095-18 By: Steve Jankowski, City Engineer <br /> <br />aange to Project g95-18, the extension of water and sewer to River Ph:,~/47 <br />al plan called for extending a sanitary sewer to the south side of the entrance <br />shopping center. This would cause some degree of traffic disruption during <br />ontinued inconvenience during the period between the excavation and final <br /> <br />bituminous patching. To avoid this, the manhole was moved to the north side of the drive. The <br />change order is for tlae cost of the precast manhole base. This cost change will offset by a reduced <br />length of sewer pipe land from the elimination of restoration of the service drive. <br /> <br />Staff Recommen lation: <br /> <br />Approve Change or der for Improvement Project g95-18 in the amount of $648..14. <br /> <br />Committee Actio ~: <br /> <br />Motion to recommend Council approval of Change Order #1 for Improvement Project g95-18 in <br />the amount of $648114. <br /> <br />Reviewed by: <br /> <br />City Engineer <br /> <br />R&B: 11/28/95 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.