Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br />CHA1~ <br /> <br />Background: <br /> <br />There was a minor ¢ <br />Addition. The origh <br />to the River's Bend <br />the excavation and <br /> <br /> CASE # <br />IGE ORDER FOR IMPROVEMENT PROJECT 095-18 By: Steve Jankowski, City Engineer <br /> <br />aange to Project g95-18, the extension of water and sewer to River Ph:,~/47 <br />al plan called for extending a sanitary sewer to the south side of the entrance <br />shopping center. This would cause some degree of traffic disruption during <br />ontinued inconvenience during the period between the excavation and final <br /> <br />bituminous patching. To avoid this, the manhole was moved to the north side of the drive. The <br />change order is for tlae cost of the precast manhole base. This cost change will offset by a reduced <br />length of sewer pipe land from the elimination of restoration of the service drive. <br /> <br />Staff Recommen lation: <br /> <br />Approve Change or der for Improvement Project g95-18 in the amount of $648..14. <br /> <br />Committee Actio ~: <br /> <br />Motion to recommend Council approval of Change Order #1 for Improvement Project g95-18 in <br />the amount of $648114. <br /> <br />Reviewed by: <br /> <br />City Engineer <br /> <br />R&B: 11/28/95 <br /> <br /> <br />