Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br />,I <br /> <br />CHANGE <br /> <br /> CASE <br /> <br />ORDER FOR IMPROVEMENT PROJECT ~)5-18 <br />By: Steve Jankowski, City Engineer <br /> <br />Background: <br /> <br />There was a mino~ change to Project g95-18, the extension of water and sewer to River Plaza/47 <br />Addition. The original plan called for extending a sanitary sewer to the south side of the entrance <br />to the River's Berid shopping center. This would cause some degree of wa.fflc disruption during <br />the excavation and continued inconvenience during the period between the excavation and final <br />bituminous pateki~g. To avoid this, the manhole was moved to the north side of the drive. The <br />change order is fotthe cost of the precast manhole base. This cost change will offset by a reduced <br />length of sewer pi~e and from the elimination of restoration of the service drive. <br />Staff Recommei~dation: <br /> <br />Approve Change Ch'der for Improvement Project g95-18 in the amount of $648.14. <br /> <br />Committee Action: <br /> <br />Motion to recomn~end Council approval of Change Order .#1 for Improvement Project g95-18 in <br />the amount of $648.14. <br /> <br />Reviewed by: <br /> <br />City Engineer <br /> <br />R&B: 12/12/95 <br /> <br /> <br />